DOI QR코드

DOI QR Code

Schedule Optimization of PC Production Operation with Mould Rebuilding

몰드 리빌딩을 적용하는 PC생산 공정의 스케줄 최적화

  • 박영준 (경북대학교 건축.토목공학부) ;
  • 손창백 (세명대학교 건축공학과) ;
  • 이동은 (경북대학교 건축.토목공학부)
  • Received : 2013.09.04
  • Published : 2013.11.25

Abstract

The steel mould for PC production has a considerable cost effect on Precast Concrete(PC) manufacturing. PC manufacturers change the shapes and/or dimension(i.e., length and height etc) of the mould, which is called as rebuilding, to reduce the production cost. In this way, the manufacturers increase the reusability of moulds if they have a similar cross-section. Because there are various shapes and/or types of PC products(e.g., Beams, Girders, Columns), the priority of PC members production may cause different process idle time and productivity. This paper present an optimization method that 1) identifies the priorities of PC members having different mould types to minimize the process idle time between the members in daily production, and 2) evaluates schedule performance involved in PC production and/or procurement. A case study verifies the effectiveness and validity of the method. This methodology suggests the optimal production duration in PC manufacturing and priority of work. And the schedule optimization has saving of PC production cost.

Keywords

Acknowledgement

Supported by : 한국연구재단

References

  1. 한국복합화건축기술협회․한국PC협회, Precast Concrete, 1판, 기문당
  2. Al-Bazi, A. F., Dawood, N. N. and Dean, J. T., Improving performance and the reliability of off-site pre-cast concrete production operations using simulation optimization, Journal of Information Technology in Construction, 15, 335-336, 2010
  3. Benjaoran, V., Dawood, N., & Hobbs, B., Flowshop scheduling model for bespoke precast concrete production planning, Journal of Construction Management and Economics, 23, 93-105, 2005 https://doi.org/10.1080/0144619042000287732
  4. Chan, W. T. and Hu, H., Production scheduling for precast plants using a flow shop sequencing model, Journal of computing in civil engineering, 16, 165-174, 2002 https://doi.org/10.1061/(ASCE)0887-3801(2002)16:3(165)
  5. Chan, W. T. and Hu, H., Constraint Programming Approach to Precast Production Scheduling, Journal of Construction Engineering and Management, ASCE, 128, 513-521, 2002 https://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(513)
  6. Chien. H. K. and Shu. F. W., Precast production scheduling using multi-objective genetic algorithms, Expert Systems with Applications, 38, 8293-8302, 2011 https://doi.org/10.1016/j.eswa.2011.01.013
  7. Dawood, N. N., and Neale, R. H., A Capacity planning model for precast concretebuilding products, Journal of Building and Environment, 28, 81-95, 1993 https://doi.org/10.1016/0360-1323(93)90009-R
  8. Dawood, N. N., and Marasini, R., Stockyard layout planning and management for the precast concrete products industry, Logistics Information Management, 14, 328-337, 2001 https://doi.org/10.1108/EUM0000000006245
  9. Hu. H., A study of resource planning for precast production, Architectural Science Review, 50, 106-114, 2007 https://doi.org/10.3763/asre.2007.5016
  10. Leu, S. S., and Hwang, S. T., GA-based resource-constrained flow-shop scheduling model for mixed precast production, Automation in Construction, 11, 439- 452, 2002 https://doi.org/10.1016/S0926-5805(01)00083-8
  11. Tsao, C. C. Y., Tommelein, I. D., Swanlund, E. S., and Howell, G. A., Work structuring to achieve integrated product-process design, Journal of Construction Engineering and Management, 130, 780-789, 2004 https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(780)
  12. West, M., Flexible fabric molds for precast trusses. Concrete Precasting Plant and Technology, 72, 46-52, 2006
  13. Xiaofeng Z., Tiong R. L. K., Bjornsson H. C., Chua D. K. H., Simulation-based planning for precast production with two critical resources, Proceedings of the 39th conference on winter simulation, WSC '07, 2104-2111, 2007
  14. Ziverts, G., and Bajars, E., Production Planning and Scheduling for Long Line Prestress Products, PCI JOURNAL, 66-99, 1977