Abstract
This paper deals with TVC nozzle stroke verification test and corresponding analysis techniques related to kick motor TVC system of KSLV-I second stage. It is shown that the relationship between TVC stroke and potentiometer voltage is revealed via the open-loop stroke verification test, and other major operational parameters including nozzle alignment error, actuation error, neutral position, radius of nozzle rotation, location of nozzle rotation center, angle conversion coefficients, etc. are analyzed via the closed-loop stroke verification test. The TVC stroke verification test results for the first and second flight model of KSLV-I show that all TVC operational parameters of KSLV-I second stage were normally setup for the first and second flight tests.
본 논문에서는 나로호 2단 킥모터 TVC 노즐에 대한 행정확인시험 방법과 행정확인시험 데이터로부터 TVC 운용 특성을 분석하는 과정 및 결과에 대해 다루었다. 개루프 행정확인 시험을 통해 TVC 스트로크와 포텐셔미터 전압 간의 관계를 분석하고, 폐루프 행정확인시험을 통해 노즐정렬오차, TVC 구동오차, TVC 중립위치, 플렉스씰 노즐의 회전중심위치, 비행시험후 분석에 사용할 노즐각 환산계수 등을 분석할 수 있음을 보였다. 아울러, 나로호 1호기 및 2호기 TVC 시스템에 대해 행정확인시험을 수행한 결과 TVC 운용 관련 모든 파라미터가 정상 범위 내에서 설정되었음을 정량적인 수치로써 제시하였다.