DOI QR코드

DOI QR Code

Life Cycle Cost Breakdown Structure Development of Buildings through Delphi Analysis

  • Jeong, Jae-Hyuk (Department of Architectural Engineering, Mokpo National University) ;
  • Shin, Han-Woo (Department of Architectural Engineering, Mokpo National University) ;
  • Ryu, Han-Guk (Department of Architectural Engineering, Changwon National University) ;
  • Kim, Gwang-Hee (Department of Architectural Engineering, Kyonggi University) ;
  • Kim, Tae-Hui (Department of Architectural Engineering, Mokpo National University)
  • 투고 : 2012.03.26
  • 심사 : 2012.08.06
  • 발행 : 2012.10.20

초록

With domestic construction projects becoming bigger, more specialized and more advanced, the construction industry is striving to improve quality and quantity, and is diversifying functions and shapes. Nevertheless, the process of a construction project causes problems when we estimate construction price, because the cost breakdown structures are different in each step. The primary aim of this study was to estimate building life cycle cost using the Delphi method. The cost breakdown structure for life cycle cost was classified into planning, design, construction, maintenance and waste disposal, and each detailed classification was determined by estimating life cycle cost. Moreover, the developed cost breakdown structure is verified by consulting with experts to secure objectivity and validity.

키워드

참고문헌

  1. Choi OY, Kim TH, Kim GH. A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing. Journal of the Korea Institute of Building Construction. 2008 Oct;8(5):127-35.
  2. Park KJ. The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure. Journal of the Korea Institute of Building Construction. 2005 May;5(1):97-105.
  3. Kwon OB, Son JH, Lee SH. Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency. Journal of the Korea Institute of Building Construction. 2010 Dec;10(6):49-61.
  4. Lee JS. Study Method 21 Delphi Method. Paju-si (Korea): Kyoyookbook; 2001. 138 p.
  5. Kang HW, Yoo JH, Kim YS. A Study on the Estimation of Elemental Costs for an Apartment Building. Journal of Construction Management. 2007 Apr;8(2):173-82.
  6. Hyun CT, Hong TH, Son MJ, Lee HC, Ha SH. Development of the Cost Breakdown Structure Organization Tool for the Planning Phase of Mixed Used Development Projects. Journal of Architectural Institute of Korea. 2009 Aug;25(8):185-95.
  7. Hyun CT, Hong TH, Koo KJ, Yeon HJ, Moon HS, Cho KM. Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects. Journal of Construction Management. 2007 Dec;8(6):178-88.
  8. Jung SS. A Study on the Cost Analysis Breakdown System for Decision makerin Life Cycle Cost Analysis. Journal of Architectural Institude of Korea. 2004 Mar;20(3):201-11
  9. Lee MH, Jung YH, Park TK. A Study on the Establishment of Maintenance Standards(Repair Periods and Rates) of Educational Facilities. Journal of Architectural Institude of Korea. 2009 Sep;25(9):145-52.
  10. Kang HW, Won YM, Kim YS. A Study on the Long-Term Maintenance Costs and Elemental Maintenance Costs for Apartment Buildings. Journal of Architectural Institute of Korea. 2010 Nov;26(11):111-9.
  11. Lee CK, Lee MH, Cho BH, Choi JH, Park TK. A Study on Development of Life Cycle Cost Analysis System for Build-Transfer-Lease Projects. Journal of Architectural Institute of Korea. 2008 Apr;24(4):53-62
  12. Kim YS, Kang HW. Variation Range for Maintenance Costs of Education Facilities Based on LCC Analysis. Journal of Construction Management. 2010 May;11(3):72-80. https://doi.org/10.6106/KJCEM.2010.11.3.72
  13. Korea Advanced Institute of Science and Technology. Standard of Estimate for Architectural Work. Gccity-si (Korea): Ministry of Construction Transportation; 2010. p. 757-1036
  14. Charette RP, Marshall HE. Uniformat II Element Classification for Building Specifications, cost estimation and cost analysis. West Conshohocken (PA): ASTM; 1999. p. 12-26
  15. Chua D, Godinot M. Use of a WBS Matrix to Improve Interface Management in Projects. Journal of Construction Engineering and Management. 2006 Jan;132(1):67-79. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(67)
  16. Jung YS, Woo S. Flexible Work Breakdown Structure for Integrated Cost and Schedule Control. Journal of Construction Engineering and Management. 2004 Oct;130(5):616-25. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(616)

피인용 문헌

  1. A Linkage Method for the Life Cycle Cost Breakdown Structure through an Analysis of Boundary Conditions vol.13, pp.4, 2013, https://doi.org/10.5345/JKIBC.2013.13.4.321