Space Zoning Module for Simulation Modeling

공구분할을 위한 시뮬레이션 조닝모듈 개발

  • 곽한성 (경북대학교 건축.토목공학부) ;
  • 손창백 (세명대학교 건축공학과) ;
  • 이동은 (경북대학교 건축.토목공학부)
  • Received : 2012.06.28
  • Published : 2012.10.25

Abstract

Task based modeling is essential in a construction operation simulation modeling. It allows dealing with local variables or delay factors that affect productivity and improves the reusability of existing operation models. An operation model can secure reality only if it reflects the real construction processes by effectively dealing with zoning issue. However, system users have some difficulties in modeling a construction operation that is consisted of several processes having different production units. Zoning is a major modeling issue when the task based modeling method is implemented using the existing discrete event simulation systems. This paper highlights the difficulty and presents a new method that complements the zoning issues attributed to different production units. The method is described in detail by presenting the flow of entities. It is confirmed that the zoning method effectively deals with the unbalance of production units between processes and facilitates to model an operation model having processes with different production units. The "Zoning module" contributes to increasing accuracy of simulation result.

Keywords

Acknowledgement

Supported by : 한국연구재단

References

  1. 박동근, 이경석, 유병인, 김영석, 한승우, "건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안", 한국건설관리학회 학술발표대회논문집, 263-268, 2008
  2. 이경석, 이정훈, 김현미, 김영석, 한승우, "건설시뮬레이션기법을 이용한 시스템 철골계단 공법의 생산성 분석", 춘계학술발표대회논문집, 제10권(1호), 2010
  3. 이창용, 이동은, "네스팅 기법을 활용한 공정 및 일정 통합 시뮬레이션 시스템" 대한건축학회논문집, 제27권(10호), 2009
  4. 임태경, 손창백, 이동은, "요소작업 기반 티어공법 철골조립 시뮬레이션 모델", 대한건축학회논문집, 제27권(10호), 177-188, 2011
  5. 조동열, 이승현, 손재호, "Web-Cyclone을 활용한 샌드위치 패널공사 작업조별 생산성분석 및 공사금액 예측에 대한 연구", 한국건설관리학회 학술발표대회논문집, 269-274, 2008
  6. 조재호, 전재열, "철골세우기공사에서 영향요인 기반의 웹싸이클론 생산성 정보모델 및 활용에 관한 기초 연구", 대한건축학회논문집, 제27권(12호), 2011
  7. Chang (1986). "RESQUE: A resource based simulation system for construction process planning" PhD Dissertation. University of Michigan, Ann Arbor, Mich.
  8. Geaham, D., Smith, S. D., and Crapper, M. (2004). "Improving Concrete Placement Simulation with a Case-Based Reasoning Input." J. of Civil Engineering and Environmental Systems, 21(2). 137-150. https://doi.org/10.1080/10286600410001688937
  9. Halpin, D.W., and Riggs, L.S. (1992). Planning and analysis of construction operations, John Wiley & Sonm Inc, New York
  10. Huang and Halpin (1994). " Simulation of Cable-Stated Bridges Using DISCO." Proceedings of the 26th conference on Winter simulation 1130-1136.
  11. Ioannou, P. G., (1990). "UM-CYCLONE." Department of Civil and Encironmental Engneering, University of Michigan, Ann arbor, Michigan.
  12. Lee, D.-E., Yi, C.-Y., Lim, T.-K., and Arditi, D. (2010). "Intergrated Simulation System for Construction Operation and Project Scheduling." ASCE, Journal of Computing in Civil Engineering, 24(6). 557-569. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000061
  13. Liu (1995). "Simulating Construction Operations of Precast-Concrete Parking Structures." Proceedings of the 1995 Winter Simulation Conference, 1004-1008.
  14. Sawhney and AbouRizk (1994). "$AP^3$-Advanced Project Planning Paradigm for Construction." Proceedings of the 26th conference on Winter simulation 1153-1158.
  15. Tommelein et al (1994). "Knowledge-Based Assembly of Simulation Networks Using Construction Designs, Plans, and Methods." Proceedings of the 1994 Winter Simulation Conference, 1145-1152.