References
- Aarts, E. H. L., Frans, M. J., and Habers, E. H. A. (1986), Parallel implementations of the statistical cooling algorithm, VLSI Journal, 4(3), 209-238. https://doi.org/10.1016/0167-9260(86)90002-7
- Abdul-Razaq, T. S. and Potts, C. N. (1988), Dynamic programming state-space relaxation for single-machine scheduling, Journal of Operational Research Society, 39(2), 141-152. https://doi.org/10.1057/jors.1988.26
- Bagchi, U., Sullivan, R. S., and Chang, Y. L. (1987), Minimising mean squared deviation of completion times about a common due date, Management Science, 33, 894-906. https://doi.org/10.1287/mnsc.33.7.894
- Baker, K. R. (1974), Introduction to Sequencing and Scheduling, Wiley, New York.
- Cho, S.-H. and Erkoc, M. (2009), Design of predictable production scheduling model using control theoretic approach, international, Journal of Production Research, 47(11), 2976-2993.
- Glover, F. (1986), Future paths for integer programming and links to artificial intelligence, Computers and Operations Research, 13(5), 533-549. https://doi.org/10.1016/0305-0548(86)90048-1
- Goldberg, D. E. (1989), Genetic algorithms in search, optimisation, and machine learning, Addison-Wesley, Boston.
- Holt, C. C. (1957), Forecasting Seasonal and Trends by Exponentially Weighted Moving Averages, Carnegie Institute of Technology, Pittsburgh.
- Kim, J.-D. and Ok, C.-S. (2008), Distributed feedback control algorithm for dynamic truck loading scheduling problem, Applied Mathematics and Computation, 1, 275-284.
- Lee, S.-H. and Lee, S.-W. (2009), Ant colony system for vehicle routing problem with simultaneous delivery and pick-up under time windows, Journal of the Korean Institute of Industrial Engineers, 35(2), 160-170.
- Li, G. (1997), Single machine earliness and tardiness scheduling, European Journal of Operational Research, 96, 546-558. https://doi.org/10.1016/S0377-2217(96)00062-8
- Parunak, H. D. (1991), Characterising the manufacturing scheduling problem, Journal of Manufacturing Systems, 10(3), 241-259. https://doi.org/10.1016/0278-6125(91)90037-3
- Prabhu, V. V. and Duffie, N. A. (1999), Nonlinear dynamics in distributed arrival time control of heterarchical manufacturing systems, IEEE Transactions on Control Systems Technology, 1(6), 724-730.
- Prabhu, V. V. (2000), Performance of Real-time Distributed Arrival Time Control in Heterarchical Manufacturing Systems, IIE Transactions, 32, 323-331.
- Pirlot, M. (1992), General local search heuristics in combinatorial optimisation : a tutorial, Belgium Journal of Operations Research, 32, 8-67.
- Sabuncuoglu, I. and Karabuk, S. (1999), Rescheduling frequency in an FMS with uncertain processing times and unreliable machines, Journal of Manufacturing Systems, 18(4), 269-283.
- Simchi-Levi, D. (2006), Designing and Managing the Supply Chain, 3, McGraw-Hill, New York.