참고문헌
- Baker, K. R. (1974), Introduction to sequencing and scheduling: John Wiley and Sons, Inc.
- Bley, A., Boland, N., Fricke, C., and Froyland, G. (2010), A strengthened formulation and cutting planes for the open pit mine production scheduling problem, Computers and Operations Research, 37, 1641-1647. https://doi.org/10.1016/j.cor.2009.12.008
- Boland, N., Dumitrescu, I., Froyland, G., and Gleixner, A. M. (2009), LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity, Computers and Operations Research, 36, 1064-1089. https://doi.org/10.1016/j.cor.2007.12.006
- Caccetta, L. and Giannini, L. M. (1988), An application of discrete mathematics in the design of an open pit mine, Discrete Applied Mathematics, 21, 1-19. https://doi.org/10.1016/0166-218X(88)90030-3
- Caccetta, L. and Hill, S. P. (2003), An application of branch and cut to open pit mine scheduling, Journal of Global Optimisation, 27, 349-365. https://doi.org/10.1023/A:1024835022186
- Caccetta, L., Giannini, L. M., and Kelsey, P. (1994), On the implementation of exact optimisation techniques for open pit design, Asia-Pacific Journal of Operational Research, 11, 155-170.
- Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., and Rubio, E. (2009), A new algorithm for the open-pit mine scheduling problem: Working paper, University Blaise Pascal, Clermont-Ferrand, France.
- Choi, Y., Park, H., Sunwoo, C., and Clarke, K. C. (2009), Multi-criteria evaluation and least-cost path analysis for optimal haulage routing of dump trucks in large scale open-pit mines, International Journal of Geographical Information Science, 23(12), 1541-1567. https://doi.org/10.1080/13658810802385245
- Cullenbine, C., Wood, R. K., and Newman, A. (2011), A sliding time window heuristic for open pit mine block sequencing, Optimisation Letters, doi: 10.1007/s11590-011-0306-2.
- Hochbaum, D. S. and Chen, A. (2000), Performance analysis and best implementations of old and new algorithms for the open-pit mining problem, Operations Research, 48(6), 894-914. https://doi.org/10.1287/opre.48.6.894.12392
- Kozan, E. and Liu S. Q. (2011), Operations Research for Mining: A Classification and Literature Review, ASOR Bulletin, 30(1), 2-23.
- Kumral, M. and Dowd, P. A. (2005), A simulated annealing approach to mine production scheduling, Journal of the Operational Research Society, 56, 922-930. https://doi.org/10.1057/palgrave.jors.2601902
- Lerchs, H. and Grossmann, I. F. (1965), Optimum design of open-pit mines, Transactions on CIM, LX VIII, 17-24.
- Myburgh, C. and Deb, K. (2010), Evolutionary algorithms in large-scale open pit mine scheduling, GECCO'10, Portland, Oregon, USA.
- Ramazan, S. (2007), The new fundamental tree algorithm for production scheduling of open pit mines, European Journal of Operational Research, 177, 1153-1166. https://doi.org/10.1016/j.ejor.2005.12.035
- Souza, M. J. F., Coelho, I. M., Ribas, S., Santos, H. G., and Merschmann, L. H. C. (2010), A hybrid heuristic algorithm for the open-pit-mining operational planning problem, European Journal of Operational Research, 207, 1041-1051. https://doi.org/10.1016/j.ejor.2010.05.031
- Sundar, D. K. and Acharya, D. (1995), Blast schedule planning and shift wise production scheduling of an opencast iron ore mine, Computers and Industrial Engineering, 28(4), 927-935. https://doi.org/10.1016/0360-8352(94)00221-8
- Tolwinski, B. and Underwood, R. (1996), A scheduling algorithm for open pit mines, IMA Journal of Mathematics Applied in Business and Industry, 7, 247-270.
- Topal, E. and Ramazan, S. (2010), A new MIP model for mine equipment scheduling by minimizing maintenance cost, European Journal of Operational Research, doi: 10.1016/j.ejor.2010.05.037.
- Underwood, R. and Tolwinski, B. (1998), A mathematical programming viewpoint for solving the ultimate pit problem, European Journal of Operational Research, 107(1), 96-107. https://doi.org/10.1016/S0377-2217(97)00141-0
피인용 문헌
- A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations vol.125, pp.1, 2016, https://doi.org/10.1179/1743286315Y.0000000031
- Evaluating crusher system location in an open pit mine using Markov chains vol.31, pp.1, 2017, https://doi.org/10.1080/17480930.2015.1105649
- Job shop scheduling with a combination of four buffering constraints pp.1366-588X, 2017, https://doi.org/10.1080/00207543.2017.1401240
- Integration of mathematical models for ore mining industry pp.2330-2682, 2017, https://doi.org/10.1080/23302674.2017.1344330
- Open-pit block sequencing optimization: A mathematical model and solution technique vol.48, pp.11, 2012, https://doi.org/10.1080/0305215x.2016.1142080
- A review of factors affecting mining operation vol.17, pp.3, 2012, https://doi.org/10.1108/wje-03-2019-0082