Abstract
In this paper, we performed thermodynamic energy balance analysis of the underground lined rock cavern for compressed air energy storage (CAES) using the results of multi-phase heat flow analysis to simulate complex groundwater-compressed air flow around the cavern as well as heat transfer to concrete linings and surrounding rock mass. Our energy balance analysis demonstrated that the energy loss for a daily compression and decompression cycle predominantly depends on the energy loss by heat conduction to the concrete linings and surrounding rock mass for a sufficiently air-tight system with low permeability of the concrete linings. Overall energy efficiency of the underground lined rock caverns for CAES was sensitive to air injection temperature, and the energy loss by heat conduction can be minimized by keeping the air injection temperature closer to the ambient temperature of the surroundings. In such a case, almost all the heat loss during compression phase was gained back in a subsequent decompression phase. Meanwhile, the influence of heat conductivity of the concrete linings to energy efficiency was negligible.
본 연구에서는 지하 압축공기에너지 저장공동 주변 지하수 및 압축공기의 유체유동과 열전달 거동 해석을 위한 다상다성분 열유동 해석 결과를 이용하여 지하 저장공동의 열역학적 에너지수지 분석을 통한 에너지 효율평가를 실시하였다. 복공재인 콘크리트 라이닝이 충분한 기밀성능을 발휘할 경우, 주입 압축과정에서 저장공동으로부터 손실되는 에너지의 대부분은 콘크리트 라이닝 및 주변 암반에의 열전도를 통해 발생함을 확인하였다. 지하 압축공기에너지 저장공동의 에너지 효율은 압축공기 주입온도에 민감한 결과를 보였으며, 주입온도가 주변 암반의 온도에 근사할 경우, 손실된 에너지의 대부분이 토출 팽창과정에서 저장공동으로 유입 회수되는 결과를 보였다. 한편, 콘크리트 라이닝의 열전도특성이 저장공동의 에너지효율에 미치는 영향은 크지 않았다.