References
- 박현석, 정영수 (1999). "건설현장 공정관리의 활성화 요소", 대한건축학회논문집, 제15권, 제9호, pp. 133-140
- 정영수, 박현석, 문지용 (2000). 공정원가 통합관리 활성화 방안: EVMS 현장 적용을 위한 개선 방향, CERIK Working Paper No. 25, 한국건설산업연구원, 서울.
- 정영수(2010)." 건설사업관리자(CM) 정보시스템현황및발전과제", CM Herald, 한국CM협회, 2010년 12월호, 제71호, pp. 17-18.
- CII (2004). Radical Reduction in Project Cycle Time, Research Report 193-11, Construction Industry Institute (CII), University of Texas at Austin.
- Hastak, M., Gokhale, S., Goyani, K., Hong, T. and Safi, B. (2007). "Project Manager's Decision Aid for a Radical Project Cycle Reduction", Journal of Construction Engineering and Management, 133(6), pp. 437-446. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(437)
- Hastak, M., Gokhale, S., Goyani, K., Hong, T. and Safi, B. (2008). "Analysis of Techniques Leading to Radical Reduction in Project Cycle Time", Journal of Construction Engineering and Management, 134(12), pp. 915-927. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:12(915)
- Hegazy, T and Kamarah, E. (2008). "Efficient Repetitive Scheduling for High-Rise Construction", Journal of Construction Engineering and Management, 134(4), pp. 253-264. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:4(253)
- Hu, D., and Mohamed, Y. (2010)." State-Based Simulation Mechanism for Facilitating Project Schedule Updating", Proceedings of the 2010 Construction Research Congress, ASCE, Banff, Canada, doi:10.1061/41109(373)37.
- Kim, B. and Reinschmidt, K. F. (2010). "Probabilistic Forecasting of Project Duration Using Kalman Filter and Earned Value Method", Journal of Construction Engineering and Management, 136(8), pp. 834-843. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000192
- Jung, Y. (2008). "Automated Front-End Planning for Cost and Schedule: Variables for Theory and Implementation", Proceedings of the 2008 Architectural Engineering National Conference, ASCE, Denver, USA, doi: 10.1061/41002(328)43.
- Jung, Y. and Gibson, G. E. (1999)," Planning for Computer Integrated Construction", Journal of Computing in Civil Engineering, 13(4), pp. 217-225. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
- Jung,Y. and Kang, S. (2007)," Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control", Journal of Construction Engineering and Management, 133(1), pp. 10-21. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(10)
- Liu, S.S. and Shih, K.C. (2009)" Construction rescheduling based on a manufacturing rescheduling framework", Automation in Construction, 18(6), pp. 715-723. https://doi.org/10.1016/j.autcon.2009.02.002
- Okmen, O. and Oztas, A. (2008) "Construction Project Network Evaluation with Correlated Schedule Ris Analysis Model", Journal of Construction Engineering and Management, 134(1), pp. 49-63. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(49)
- PMI. (2008). A Guide to the Project Management Body Of Knowledge (PMBOK). 4th Ed., .Project Management Institute (PMI). Newtown Square. PA., U.S.A.
- Senior, B.A. and Halpin, D.W. (1998). "Simplified Simulation System for Construction Projects", Journal of Construction Engineering and Management, 124(1), pp. 72-81 https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(72)
- Yamin, R. A. and Harmelink, D. J. (2001)." Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)", Journal of Construction Engineering and Management, 127(5), pp. 374-381' https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(374)
Cited by
- Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM vol.14, pp.3, 2013, https://doi.org/10.6106/kJCEM.2013.14.3.088
- Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction vol.270, 2014, https://doi.org/10.1016/j.nucengdes.2013.12.053