DOI QR코드

DOI QR Code

Patterns and Trends in Cost Control Practice of Korean General Contractors

건설기업 원가관리 패턴의 현황 및 변화 분석

  • Received : 2011.02.07
  • Accepted : 2011.03.30
  • Published : 2011.07.31

Abstract

Cost control is an exceedingly fundamental and important construction business function. Even though enormous research efforts have been exerted in this area, there has been no comprehensive and quantitative study exploring detailed cost control practice of construction companies in terms of practical patterns and trends. This paper identified the variables for practical cost control process first. A survey questionnaire was developed and used in order to collect data from Korean general contractors. Survey results analyzing responses from 45 companies show that engineering aspects of cost management has recently been strongly stressed in the construction industry. Applying various types of progress measurement method are getting popular, and the level of details in collecting job site cost data are prevalent. Cost forecasting are performed more frequently. These trends indicates the recent efforts by Korean general contractors to achieve competitive advantages in the globalized market.

원가관리는 가장 기본적인 건설관리 업무기능 중 하나로서, 전통적인 관리기법이 오랫동안 활용되어 왔다. 그럼에도 불구하고, 각 건설조직 또는 각 프로젝트 특성에 따라 원가관리의 실무적인 세부기법들은 다소 다르게 적용되며, 이러한 세부기법의 선택적용은 발주방식, 경영전략, 기술전략, 그리고 현장여건 등을 포함하는 포괄적인 프로젝트 환경에 의하여 영향을 받게 된다. 우리 건설기업은 지속적이며 급격한 환경변화에 적응하며 성장하여 왔다. 이러한 맥락에서, 본 연구에서는 기업차원의 원가관리 방법을 조사함으로써 현황파악과 함께 변화추세를 분석하였다. 원가관리는 '재무관점 원가' 뿐 아니라 '기술관점 원가'에서도 매우 중요한 의미를 갖고 있으며, 본 조사는 기술적 관점의 원가로서 사업관리 기술 변화를 파악하는 데 중점을 두었다. 연구방법으로는, 우선 원가관리의 실무기능을 분류 정의하였으며, 이를 바탕으로 설문을 작성하여 각 기업의 관리방법을 조사하였고, 마지막으로 설문응답을 분석을 통하여 시사점을 도출하였다. 총 45개 종합건설기업의 응답결과를 기업규모, 매출특성 등을 기준으로 분류하여 분석하였다.

Keywords

References

  1. 문지용, 정영수, 김예상. (2000). "건설기업의 원가관리 현황과 개선요소", 대한건축학회논문집, 16(3), pp. 77-83.
  2. 연규홍(2003)." 건설업의 원가관리 실태와 효율적 방안에 관한 연구", 제13차 한국세무회계학회 학술발표대회 논문집, 13권, pp. 38-65.
  3. 정영수.박현석∙문지용 (2000). 공정원가 통합관리 활성화 방안: EVMS 현장 적용을 위한 개선 방향, CERIK Working Paper No. 25, 한국건설산업연구원, 서울.
  4. 정영수.우성권 (2001)," 공정/원가 통합관리의 국내 현장 적용 방안", 대한토목학회논문집, 21(3-D), pp. 365-374.
  5. 한경진∙이현수∙박문서 (2007) "건설사업 원가관리의 정략적 정의 및 방법론", 대한건축학회 학술발표대회 논문집, 27(1), pp.781-784.
  6. Jung, Y. and Gibson, G. E. (1999), "Planning for Computer Integrated Construction", Journal of Computing in Civil Engineering, 13(4), pp. 217-225. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
  7. Jung, Y. and Kang, S. (2007), "Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control", Journal of Construction Engineering and Management, 133(1), pp. 10-21. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(10)
  8. Jung, Y. and Lee, S. (2010), "Automated Progress Measurement and Management in Construction: Variables for Theory and Implementation", Proceedings of the International Conference on Computing in Civil and Building Engineering-2010 (ICCCBE 2010), Nottingham, UK, Paper No. 117.
  9. PMI. (2008). A Guide to the Project Management Body Of Knowledge, 4th Ed. Project Management Institute (PMI). Newtown Square, PA., USA.
  10. Zhan, J. A. (1998). "A Project Cost Control Model", Cost Engineering, 40(12), pp. 31-34.

Cited by

  1. An Analysis of Core Competency of Construction Field Engineer for Cost Management vol.14, pp.5, 2013, https://doi.org/10.6106/KJCEM.2013.14.5.026
  2. Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM vol.14, pp.3, 2013, https://doi.org/10.6106/kJCEM.2013.14.3.088