Abstract
A control system has been developed by korean engineers for 500MW korean standard type fossil power plant with the advent of retrofit of old control system. The developed control system is required to verify in terms of function and reliability prior to application to a power plant because a power plant is a very important facility in the industry. It is difficult to secure the enough period for installing the control system and commissioning due to the gradual increase of power demand and competitive power market environment. It is essential to verify the control system in order to reduce trial and error cases during overhaul period for application of control system to the power plant. This paper shows the case study of a functional test of a station of control system for power plant.
국내 전력의 수요증가로 인해 전력산업에서 신경망 역할을 하는 I&C(Instrumentation & Control)의 중요성이 날로 증가하고 있으며, 외국 선진 제작사의 기술 보호로 제어 시스템의 국산화가 요구되고 있는 상황이다. 이러한 상황에서 500MW급 초임계압 표준 석탄화력 발전소에의 실증 적용을 목표로 국산 통합 감시 제어시스템 개발 연구가 진행되고 있다. 개발하는 통합 감시 제어시스템은 발전설비의 중요성으로 인해 개발과정이나 개발 후 발전 설비에 적용되기 전에 시스템의 기능 및 신뢰성 등의 검증이 요구되고 있다. 또한 전력수요의 증가로 인해 제어시스템 설치 및 시운전 기간의 충분한 확보가 어려운 시점에서, 향후 실증 적용시 시행착오를 줄이기 위해 제어 시스템의 검증은 필수적이다. 본 논문에서는 개발한 제어 시스템의 기본 스테이션에 대해 기능 검증한 사례를 소개한다.