Key Performance Indicators of Building Project

건축 프로젝트의 경영성과지표 선정 연구

  • Choi, Jae-Hwi (Graduate School, Kyung Hee University) ;
  • Sohn, Hyo-Won (Department of Architectural Engineering, Kyung Hee University) ;
  • Kim, Sun-Kuk (Department of Architectural Engineering, Kyung Hee University)
  • Received : 2011.01.18
  • Accepted : 2011.02.14
  • Published : 2011.02.20

Abstract

Management performance of a construction company can be the sum of management performance of each different project. Therefore, the measurement of management performance following construction projects is essential for securing the competitiveness of a company. However, most research has been related to the performance measurement of the construction industry and companies and little has been conducted on individual project's performance. In particular, building projects have various characteristics depending on construction orderer, type and commissioning entity but no performance indicators have been selected based on this classification. This study aims to select performance indicators for subdivided areas based on project characteristics as well as those which can be commonly used to measure management performance at construction and trial run stages of building projects. In the future, those indicators proposed in this study can be used for developing methodology to evaluate them and later applied to actual building projects to generate quantitative data. In addition, they are expected to be used as reference for selecting indicators to measure management performance of plant and civil engineering projects.

건설기업의 경영성과는 제각기 다른 프로젝트들의 경영성과 합과 같으므로, 건설 프로젝트 수행에 따른 경영성과 측정은 기업 경쟁력 확보를 위해 필수적이다. 그러나 현재까지 대부분의 연구는 건설 산업 및 기업의 성과 측정과 관련되어 있으며, 개별 프로젝트의 성과 측정을 위한 연구는 여전히 미비한 실정이다. 특히 건축 프로젝트는 발주자, 형태, 사업주체에 따라 다양한 특성을 가지고 있지만, 이러한 구분에 따른 성과지표 선정은 이루어진 바없다. 따라서 본 연구는 건축 프로젝트의 시공 및 시운전 단계에서 공통적으로 경영성과를 측정할 수 있는 지표뿐만 아니라, 프로젝트 특성에 따라 세분화된 분야의 지표를 선정하는 것을 목적으로 한다. 향후 본 연구에서 제시한 지표들은 이를 평가할 수 있는 방법을 개발하고, 실제 건축 프로젝트에 적용하여 정량화된 점수로 산출이 가능할 것이다. 또한 플랜트 및 토목 프로젝트의 경영성과를 측정할 수 있는 지표 선정을 위한 참고자료로 사용될 것으로 사료된다.

Keywords

References

  1. Lee DH. An Evaluation Technique of Corporate Management Performance Using Project Information [MD dissertation]. Yongin: Kyung Hee University; 2010.
  2. Neely A. The performance measurement revolution: Why now and what next?. International Journal of Operations & Production Management 1999;19(2):205-28. https://doi.org/10.1108/01443579910247437
  3. Cha HS, Kim TK. Developing Measurement System for Key Performence Indicators on building Construction Projects. Korean Journal of Construction Engineering and Management 2008;9(4):120-30.
  4. Shin YI, Kim HS. A Study of the Application for performance measurement on Domestic Construction Industry. Proceedings of the 2th Symposium on Korean Journal of Construction Engineering and Management 2001;20(3):285-90.
  5. Yu JH, Song SH, You WH, Lee HS. Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology. Korean Journal of Construction Engineering and Management 2005;6(1):89-98.
  6. Alarcon LF, Ashley DB. Project management decision making using cross-impact analysis. International Journal of Project Management 1998;16(3):145-52. https://doi.org/10.1016/S0263-7863(97)00045-8
  7. Ellis Jr. R. Identifying and Monitoring Key Indicators of Project. In: Alarcon L, editor. Lean Construction. Rotterdam: A. A. Balkema; 1997. p.43-9.
  8. Shenhar AJ, Levy O, Dvir D. Mapping the dimensions of project success. Project Management Journal 1997;28(2):5-13.
  9. Atkinson R, Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management 1999;17(6):337-42. https://doi.org/10.1016/S0263-7863(98)00069-6
  10. Lim CS, Mohamed MZ. Criteria of project success: an exploratory re-examination. International Journal of Project Management 1999;17(4):243-8.
  11. The KPI Working Group. Key Performance Indicators for M&E Contractors: handbook and guidance. UK:Department of the Environment, Transportation and the Regions; 2003.
  12. CPA. Construction products Industry Key Performance Indicators. UK:Construction Products Association; 2002.
  13. ACE. Striving for Business Excellence. Association Consulting Engineerings; 2000.
  14. Abdullah BI, Wu J, Da W. Key Performance Indicators Supporting Decision-Making Affecting Malaysian Enterprise' Project Performance in China. American Journal of Applied Sciences 2010;7(2):241-7. https://doi.org/10.3844/ajassp.2010.241.247
  15. Construction Excellence(CE). Industry Performance Report. London, UK:CE; 2006.
  16. Construction Industry Institute(CII). Benchmarking Data Report. Austin, TX:CII; 2001.
  17. Kim MK. A Study on the Management Performance Evaluation Model of Construction Firms, [PhD dissertation]. Yongin: Kyung Hee University; 2010
  18. Cha WC, Lee JS, Kwon W, Lee JS, Chun JY. Assessment Model of a Construction Company's Management Performance. Journal of the Architectural Institute of Korea 2008;28(1):661-4.
  19. Oh IJ, Lee JH, Lee CC. BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry. Journal of Korea Society of IT Services 2006;5(1):35-46.
  20. Jung WJ, Yu IH, Kim KR, Shin DW. Analysis of the Weights of Performance Measurement Index according to the Size of Construction Companies. Journal of the Architectural Institute of Korea 2005;21(8):121-8.
  21. Yu IH, Kim KR, Jung YS, Chin SY. Key Performance Indicators for Developing Construction Performance Index. Journal of the Architectural Institute of Korea 2005;21(2):139-50.
  22. Yu IH, Kim KR, Jung YS, Chin SY. Analysis of Quantified Characteristics of the Perform: Indicators for Construction Companies. Korean Journal of Construction Engineering and Management 2006;7(4):154-63.
  23. Yu IH, Kim KR, Jung YS, Chin SY, Kim YS. A Framework of the comparable Performance Measurement in the Construction Industry. Korean Journal of Construction Engineering and Management 2004;5(5):172-82.
  24. Kaplan RS, Norton DP. The Balanced Scorecard - Measures that Drive Performance. USA, Harvard Business Review; 1992:134-47.
  25. Lee JH. Indexing Method for Target Administration and Performance Measuring in Plant Projects [MD dissertation]. Seoul: Han Yang University; 2009.
  26. Lee CJ, Kim SK, Kim JJ. The Deduction of the Success Factor in Construction Projects by Design Build Methods. Korean Journal of Construction Engineering and Management 2007;8(5):182-90.
  27. Jung SO, Kim YS, Chin SY, Yoon SW. A Proposal the Assessment Criteria and Conceptual Methodology of Performance Measurement based on Efficiency throughConstruction Project Life Cycle. Journal of the Architectural Institute of Korea 2005;21(7):139-48.
  28. Smullen J. Balance Scorecards and Activity Based Management: The Practical Application. UK, London:FT Pitman Publishing; 1997.
  29. Ward SC, Curtis B, Chapman CB. Objectives and performance in construction project. Construction Management and Economics, 1991;(9):343-53.
  30. Belassi W, Tukel OI. A new framework for determining critical success/failure factors in projects. International Journal of Project Management 1996;14(3):141-51. https://doi.org/10.1016/0263-7863(95)00064-X
  31. Hatush Z, Skimore M. Evaluating contractor prequalification data: selection criteria and project success factors. Construction Management and Economics 1997;15(2):129-47. https://doi.org/10.1080/01446199700000002
  32. Walker DHT. An investigation into construction time performance. Construction Management and Economics 1995;13(3):263-74. https://doi.org/10.1080/01446199500000030
  33. Walker DHT. The contribution of the construction management team to good construction time performance -an Australian experience. Journal of Construction Procurement 1996;2(2):4-18.
  34. Kagioglou M, Cooper R, Aouad G. Performance Measurement in Construction: a conceptual framework. Construction Management and Economics 2001;19(1):85-95. https://doi.org/10.1080/01446190010003425
  35. Wuellner WW. Project performance evaluation checklist for consulting engineers. Journal of Management in Engineering 1990;6(3):270-281. https://doi.org/10.1061/(ASCE)9742-597X(1990)6:3(270)
  36. Alarcon LF, Ashley DB. Modeling Project Performance for Decision Making, Journal of Construction Engineering and Management 1996;1222(3):265-273.

Cited by

  1. Quality Management for Utilizing BIM in Construction Phase vol.18, pp.5, 2013, https://doi.org/10.7315/CADCAM.2013.338
  2. Interaction Analysis between Construction Business Indicators and Business Performance Indicators of Architect Specialty Contractors vol.14, pp.4, 2014, https://doi.org/10.5345/JKIBC.2014.14.4.329