ARMA-PL : Tacking Nested Periods and Linear Trend Time Series Data

ARMA-PL : 시계열 데이터에 나타나는 중첩된 주기 및 선형추세에 대한 고찰

  • Suh, Jung-Yul (Department of Industrial and Systems Engineering, Kumoh National Institute of Technology) ;
  • Lee, Sae-Jae (Department of Industrial and Systems Engineering, Kumoh National Institute of Technology) ;
  • Oh, Hyun-Seung (Department of Industrial and Systems Management Engineering, Hannam University) ;
  • Koo, Ja-Hwal (Department of Industrial and Systems Engineering, Kumoh National Institute of Technology) ;
  • Lim, Taek (Department of Industrial and Systems Engineering, Kumoh National Institute of Technology) ;
  • Cho, Jin-Hyung (Department of Industrial and Systems Engineering, Kumoh National Institute of Technology)
  • 서정열 (금오공과대학교 산업시스템공학과) ;
  • 이세재 (금오공과대학교 산업시스템공학과) ;
  • 오현승 (한남대학교 공과대학 산업경영공학과) ;
  • 구자활 (금오공과대학교 산업시스템공학과) ;
  • 임택 (금오공과대학교 산업시스템공학과) ;
  • 조진형 (금오공과대학교 산업시스템공학과)
  • Received : 2010.03.24
  • Accepted : 2010.04.06
  • Published : 2010.06.30

Abstract

시계열데이터는 ARMA 분석에 적합지 않은 요소를 내재하고 있는 경우가 있다. 특히 선형성과 주기성을 가진 요소가 확률적인 분포와 자주 혼재되어 있다. 이 논문에서는 이런 선형적 주기적 요소를 찾아내고 분석하는 방법을 제시한다. 특히 주기적 요소는 여러 주기가 층층이 겹쳐져서 나타난다. 주기 간에는 서로 일정 정수비율을 유지하며, 한 주거 안에 다른 주기가 내포되어 있는 경우(nested periods)가 많다. 시간규모(time-scale)개념을 도입하여 이러한 주기적 요소를 개념적으로 정립하고자 했다. 선형적 요소와 주기적 요소가 제거된 후 추출된 데이터는 MA-approximation이라는 방법을 사용하여 가장 데이터에 근접한 ARMA 모텔을 찾아낸다. 마지막으로 선형적 주기적 요소와 ARMA 추정결과를 종합하여 control boundary를 결정하는 방법을 제시한다.

Keywords

References

  1. 구자활; "자기상관 있는 공정에서 공정진단과 관리방법에 관한연구", 석사학위논문, 금오공대, 1999.
  2. 장도수; "장치공정에서 설비 주변 환경관리에 관한연구", 박사학위논문, 금오공대, 2006
  3. 조진형 등;"A Diagnostic Method of Control-in/out in the Glass Furnace", 산업경영시스템학회지, 30(1), 2007.
  4. Box, George E. P., Jenkins, Gwilym M., and Reinsel, Gregory C.; Time Series Analysis Forecasting and Control, Prentice Hall, 1994.
  5. Box, George E. and Luceno, Alberto; Statistical Control by Monitoring and Feedback Adjustment, 1st edition, John Wiley and Sons, Inc. New York, NY, USA, 1997.
  6. Chang, Ih,Tiao,George C., and Chen, Chung; "Estimation of Time Series Parameters in the Presence of Outliers," Technometrics, 30(2), 1988.
  7. Alwan, Layth C. and Roberts, Harry V.; "Time-Series Modeling for Statistical Process Control," Journal of Business and Economic Statistics, 6(1),1988.
  8. Atienza, O. O., Tang, L. C., and Ang, B. W.; "A SPC Procedure for Detecting Level Shifts of Autocorrelated Processes," Journal of Quality Technology, 30(4), 1998.
  9. Cho, Jin-Hyung, Chang, Sung-Ho, Lee, Sae-Jae, Jang, Do-Soo, Suh, Jung-Yul, and Oh, Hyun-Seung; "Using Ambient Control to Prevent External Disturbances in Large-scale Furnace," Journal of Society of Korea Industrial and Systems Engineering, 29(2), 2006.
  10. Hogan,Jeffrey A. and Lakey, Joseph D.; "Time-Frequency and Time-Scale Methods : Adaptive Decompositions, Uncertainty Principles, and Sampling," Springer Verlag, 2004.
  11. Percival, Donald B. and Walden, Andrew T.; Wavelet Methods for Time Series Analysis, Cambridge University Press, 2006.
  12. Walker, James S.; Fast Fourier Transforms, 2nd Ed., CRC Press, 1996.
  13. Walnut,David F.; An Introduction to Wavelet Analysis, Springer Verlag,2001.