기상청 MOS 예측값 적용을 통한 풍력 발전량 예측 타당성 연구

Feasibility Study on Wind Power Forecasting Using MOS Forecasting Result of KMA

  • 투고 : 2010.02.18
  • 심사 : 2010.04.25
  • 발행 : 2010.04.30

초록

In this paper the feasibility of wind power forecasting from MOS(Model Output Statistics) was evaluated at Gosan area in Jeju during February to Octoberin 2008. The observed wind data from wind turbine was compared with 24 hours and 48 hours forecasting wind data from MOS predicting. Coefficient of determination of measured wind speed from wind turbine and 24 hours forecasting from MOS was around 0.53 and 48 hours was around 0.30. These determination factors were increased to 0.65 from 0.53 and 0.35 from 0.30, respectively, when it comes to the prevailing wind direction($300^{\circ}\sim60^{\circ}$). Wind power forecasting ratio in 24 hours of MOS showed a value of 0.81 within 70% confidence interval and it also showed 0.65 in 80% confidence interval. It is suggested that the additional study of weather conditions be carried out when large error happened in MOS forecasting.

키워드

참고문헌

  1. 지식경제부 "3차 신재생에너지 기술개발 및 이용․ 보급 기본계획" 2008.
  2. Nielsen TS, Madsen H, T$\phi$fting J. Experiences with statistical methods for wind power prediction.Proceedings of the European Wind Energy Conference, Nice,1999;1066-1069.
  3. Ernst B, Rohrig K. Online-monitoring and prediction of wind power in German transmission system operation centres. Proceedings of the First IEA Joint Action Symposium on Wind Forecasting Techniques, Nor가oping, 2002; 125-145.
  4. http://anemos.cma.fr/index.php
  5. 김경보, 이경호, 고경남, 허종철 "KWRF를 이용한 풍력발전 출력 예측 타당성 연구", 한국풍력에너지학회, 춘계학술발표회, 2008.
  6. 기상청 "강수형태 및 풍향/풍속 MOS 모델 개발과 실시간 운영 체계"디지털예보개발과 기술노트 2007-3.
  7. 제주지방기상청, 제주지방예보실무지침서, 2008; 173.