Abstract
Conceptual cost is estimated with insufficient information at an early stage of a building construction project, resulting in an inevitable gap between conceptual estimated cost and real constructed cost. For a project to be successful, this gap must be managed to be lower than a reliable level. Therefore, the purpose of this study is to propose a structural process for managing the reliability of conceptual cost estimates at an early stage of a building construction project. In researching this study, conceptual cost estimate experts were interviewed,and a risk management process was studied. Reliability assessment and a review process for improving the quality of conceptual cost estimate and the planning strategy of reliability management based on previous similar projects were added to the present estimate process. The proposed reliability management process will improve the chances of a successful project, by helping to decrease the risk of conceptual estimated cost.
건축 프로젝트에서 개산견적은 많은 부분들이 확정되지 않은 상태에서 수행되기 때문에 개산견적으로 산출된 공사비와 실제 시공 공사비는 차이가 발생할 수밖에 없다. 이러한 공사비의 차이를 신뢰할 수 있는 수준 이하로 관리할 필요가 있다. 따라서 본 연구에서는 건축 프로젝트 초기단계에서 실시하는 개산견적의 신뢰도를 관리할 수 있는 체계적인 프로세스를 구축하는 것을 목적으로 한다. 본 연구를 수행하기 위하여 개산견적 전문가와 면담조사를 실시하였으며, 리스크 관리 프로세스에 대한 고찰도 실시하였다. 연구결과 개산견적 신뢰도 관리를 위해서는 기존의 개산견적 프로세스에 신뢰도를 평가와 향상 방안 도출 과정이 필요하며, 유사 프로젝트를 토대로 신뢰도 관리 전략 수립 과정이 필요하다. 이러한 과정을 통해서 개산견적의 신뢰도를 당초에 설정된 허용가능한 수준 이하로 관리하여 프로젝트 공사비에 대한 리스크를 감소시켜 프로젝트를 성공적으로 수행할 수 있게 도움을 줄 수있다.