무기체계 연구개발 사업의 성능관리를 위한 기술성과측정에 관한 연구

A Study on the TPM for Performance Management of Weapon System R&D Program

  • 투고 : 2010.05.07
  • 심사 : 2010.07.23
  • 발행 : 2010.08.05

초록

In order to successfully manage of the state-of-the-art weapon system R&D program which are under the limited budget and schedule but also has a high level of technical risks, it is gaining weights to use such a scientific program management tool as TPM. Therefore, the purpose of this research is to review the concept of the TPM and its relation among MOE, MOP and TPM, and introduce an application method of TPM mainly focusing on helicopter development program. It has the organized structure, detailed procedure and 282 parameters for performance management through the TPM.

키워드

참고문헌

  1. Blanchard B. S., Fabrycky W. J., Systems Engineering and Analysis, Prentice Hall, New Jersey, 2006.
  2. Blanchard B. S., Logistics Engineering and Management, Prentice Hall, New Jersey, 2008.
  3. Department of Defense, Risk Management Guide for DoD Acquisition, DAU Press, Fort Belvoir, 2006.
  4. Commander N. D., Pisano S. C., Performance Measurement, Earned Value, and Risk Management, PEO for Air ASW(http://www.acq.osd.mil/pm/old/Old%20Papers/Papers%20-%20Govt/TPMs/tpm/nickpaso.htm).
  5. 김중명, SE기반 Project 기술성능관리 방안(K-55 탄운차 사업을 중심으로), 2007 시스템엔지니어링 추계심포지엄, pp. 115-121, 2007.
  6. 최석, 박중용, 기술성과측정 실행방안 연구, 2007 시스템엔지니어링 추계심포지엄, pp. 111-114, 2007.
  7. Mike Ferraro., Technical Performance Measurement - A Program Manager's Barometer, PM, pp. 14-20, 2002.
  8. 유이주, 박영원, "국방연구개발 프로젝트의 기술적 성과 측정․분석 프로세스 구현방안과 도구개발", 한국군사과학기술학회지, 제11권 제3호, pp. 76-88, 2008.
  9. 방위사업청 시스템엔지니어링 가이드북 Version 1.0, pp. 9-13, 2007.
  10. 방위사업청 KHP 사업관리 업무절차 "2-7. 기술성 과측정 절차", pp. 1-4, 2007.