Abstract
Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.
최근 도심지 굴착 시 고효율 급속시공이 가능한 쉴드 TBM(Tunnel Boring Machine) 공법의 도입이 점진적으로 증가하고 있다. 그러나 해당 장비에 대한 이해부족과 현지 지반조건을 충분히 고려하지 않은 상태로 쉴드 TBM의 설계 및 선정시 시공능력의 저하, 시공기간의 연장 및 공사비의 증가를 초래하는 경우가 빈번히 발생되고 있다. 이에 따라 본 사례연구에서는 풍화토, 풍화암 굴착에 적합하도록 설계된 쉴드 TBM 터널 굴착현장을 대상으로 쉴드 TBM 굴진 시 사전 지반조사의 결과와 달리 예기치 못한 경암구간 돌출로 굴진 중단 및 공기지연을 최소화하고자 적용된 대체공법의 적용성을 비교 분석하였다. 또, 터널 상 하행선 경암굴착에 적용된 대체공법의 선정부터 적용 후 결과에서 얻어진 굴진자료와 쉴드장비의 굴진속도, 공사기간, 공사비 등을 검토하여 연구대상 현장에 가장 적합한 대체공법을 판단 및 평가하였다. 본 연구의 결과를 요약하면 다음과 같다. 첫째, 굴진중단 및 대체공법 적용으로 인한 공사비, 공사기간의 증가를 방지하려면 대상현장의 정확한 지반조사가 선행되어야 하며, 이를 바탕으로 현장 지반조건에 가장 적합한 쉴드장비를 선정하는 것이 중요하다. 둘째, 대상현장에서 시행한 대체공법의 적용성을 분석한 결과, 경암구간 굴착을 위한 대체공법의 최선안은 개착 공법 후 경암 발파제거 공법임을 알 수 있었다.