참고문헌
- Duda, A. and Czachorski, T.; "Performance Evaluation of Fork and Join Synchronization Primitives," Acta Informatica, 24 : 525-553, 1987
- Garey, M. R. and Johnson D. S.; Computers and Intractability : A Guide to the Theory of NP-completeness, Freeman, 1979
- Gershwin, S. B.; Manufacturing Systems Engineering, Prentice-Hall, 1994
- Gungor, A. and Gupta, S. M.; "Disassembly Sequence Planning for Products with Defective Parts in Product Recovery," Computers and Industrial Engineering, 35 : 161-164, 1998 https://doi.org/10.1016/S0360-8352(98)00047-3
- Hariri, A. M. A. and Potts, C. N.; "A Branch and Bound Algorithm for the Two-stage Assembly Scheduling Problem," European Journal of Operational Research, 103 : 547-556, 1987 https://doi.org/10.1016/S0377-2217(96)00312-8
- Heidelberger, P. and Trivedi K. S.; "Analytic Queueing Models for Programs with Internal Concurrency," IEEE Transactions on Computers, 32 : 73-98, 1983 https://doi.org/10.1109/TC.1983.1676125
- Hodgson, T. J. and McDonald, G. W.; "Interactive Scheduling of a Generalized Flow Shop. Part 1 : Success through Evolutionary Development," Interfaces, 11 : 42-47, 1981 https://doi.org/10.1287/inte.11.2.42
- Johnson, S. M.; "Optimal Two-and Three-stage Production Schedules with Setup Times Included," Naval Research Logistics Quarterly, 1 : 61-68, 1954 https://doi.org/10.1002/nav.3800010110
- Koulamas, C. and Kyparisis, G. J.; "The Three-stage Assembly flowshop Scheduling Problem," Computers and Operations Research 28 : 689-704, 2001 https://doi.org/10.1016/S0305-0548(00)00004-6
- Lee, C.-Y., Cheng, T. C. E., and Lin, B. M. T.; "Minimizing the Makespan in the 3-machine Assembly-type Flowshop Scheduling Problem," Management Science, 3 : 616-625, 1993 https://doi.org/10.1287/mnsc.39.5.616
- O'Shea, B., Grewal S. S., and Kaebernick, H.; "State of the Art Literature Survey on Disassembly Planning," Concurrent Engineering : Research and Applications, 6 : 345-357, 1998 https://doi.org/10.1177/1063293X9800600407
- Potts, C. N.; Sevast'janov, S. V., Strusevich, V. A., Wassenhove, L. N. V., and Zwaneveld, C. M.; "The Two-stage Assembly Scheduling Problem : Complexity and Approximation," Operations Research, 43 : 346-355, 1995 https://doi.org/10.1287/opre.43.2.346
- Sun, X., Morizawa K., and Nagasawa, H.; "Powerful Heuristics to Minimize Makespan in Fixed, 3-machine, Assembly-type Flowshop Scheduling," European Journal of Operational Research, 146 : 499-517, 2003 https://doi.org/10.1016/S0377-2217(02)00245-X
- Yoon, S. H., Lee I. S., and Sung, C. S.; "A Note on the Reversibility of the Two Stage Assembly Scheduling Problem," International Journal of Management Science, 13 : 25-34, 2007