Abstract
This paper concerns the behavior of 2-Arch tunnel constructed under various conditions. A 2-Arch tunnel section adopted in a subway tunnel construction site is considered in this study. A calibrated 3D finite element model was adopted to conduct parametric studies on a variety of construction scenarios including lagged distance between left and right tunnels, overburden, and geological condition. The results of analyses were examined in terms of crown settlement, shotcrete lining stress, and load on center column in relation to the lagged distance, cover depth, and the ground condition. The results indicate that the shotcrete lining stress and the center pillar load are more influenced by the second tunnel excavation than the tunnel deformation. Also shown is that a greater lagged distance is required to minimize the interaction between two tunnels when the ground condition becomes weaker. Fundamental mechanisms of 2-arch tunnel were also discussed based on the results.
본 연구에서는 2-Arch 터널의 3차원 거동 메카니즘에 관한 내용을 다루었다. 이를 위해 도심지 지하철에 적용된 2-Arch 터널을 고려하였으며 3차원 유한요소해석을 수행하여 좌우 터널의 이격거리, 지반조건, 토피고 등에 대한 매개변수연구를 실시하였다. 해석결과 토대로 다양한 조건에 대한 터널 천단침하 및 쇼크리트 응력, 중앙기둥 작용하중 등을 중점으로 분석하였으며, 그 결과를 토대로 좌우 터널 이격거리, 지반조건, 토피고에 따른 2-Arch 터널의 거동 메카니즘을 고찰하였다. 그 결과 숏크리트 라이닝 응력 및 중앙 기둥 작용하중은 후행터널 시공에 큰 영향을 받는 것으로 나타났으며 터널관통지층이 취약할 경우 후행터널이 선행터널의 거동에 영향을 미치는 영향거리가 증가하는 것으로 분석되었다. 본 논문에서는 해석 결과를 토대로 2-Arch 터널의 시공중 변위 및 숏크리트 라이닝 응력 변화 경향에 대한 구체적인 내용을 기술하였다.