Abstract The typical distribution systems have the power flow from distribution substations (sources) to customers (load) only as one direction. However, in the case where distributed generations (DG) such as PV system and wind power systems are connected to distribution systems, the DG output variations to distribution systems, so called reverse power flow, may cause the bi-directional power flow. So, the reverse power flow has severe impacts on typical power system, for example power quality problems, protection coordination problems, and so on. Especially, protection devices (sectionalizer) in primary feeder of distribution system interconnected with distributed generations may cause problems of malfunction, and then many customers could have problems like an interruption. So, this paper presents the bi-directional operation algorithm of protection devices to overcome the problems like mal-function. And, also this paper shows the effectiveness of proposed method by using both PSCAD/EMTDC software and test facility of protection devices to simulate the field distribution systems.

기존의 배전계통은 전원 측인 배전용변전소에서 부하 측인 수용가로 전력을 단 방향으로 공급하는 것이 일반적이지만, 태양광과 풍력 등과 같은 분산전원이 배전계통에 연계되는 경우에는 분산전원에서 발생하는 전력이 계통으로 공급되는 역 조류가 발생하여 기존의 시스템과 달리 양방향으로 전력이 공급되게 된다. 이러한 양방향 전력공급은 기존의 시스템에 악 영향을 끼칠 수 있는데, 배전선로에 설치되어 있는 보호협조기기에 심각한 문제점을 발생시킬 수 있다. 특히 기존의 구간 개폐기는 주 전원 측의 전력만 감지할 뿐, 분산전원 측의 역 조류 감지 및 보호를 하지 못해 오동작을 일으킬 가능성이 존재한다. 이러한 경우 분산전원의 단독 운전뿐만 아니라 배전계통과 분산전원의 비동기 투입에 의하여 배전계통에 악영향을 끼칠 수도 있다. 따라서 본 논문에서는 이에 대한 대책으로서 역 조류를 감지하는 구간 개폐기의 양방향 동작 알고리즘을 제시하고, 이에 대한 성능을 확인하기 위하여, 배전계통의 대표적인 해석 S/W인 PSCAD/EMTDC를 이용하여 시뮬레이션을 수행하였다. 또한 보호기기 모의시험 장치를 제작하여 하드웨어적인 시험 결과를 분석하여, 본 논문에서 제안한 구간개폐기의 양방향 동작 알고리즘에 대한 효용성과 타당성을 확인하였다.

Keywords

References

  1. 분산전원 배전계통 연계기술기준, 한국전력공사 2005. 4.
  2. NREL, "Distributed Power Program DER Pilot Test at the Nevada Test Site ", NREL/TP 560-32063, May, 2002.
  3. EPRI, " Electricity Technology Roadmap, Meeting the Critical Challenge of the 21st Century ", Product No. 10100929, 2003.
  4. R. Grunbaum, "SVC Light: A Powerful Means for Dynamic Voltage and Power Quality Control in Industry and Distribution", Power Electronics and Variable Speed Drives, pp. 404-409, 18-19 September 2000, Eighth International Conference Publication No.475 @ IEE 2000. https://doi.org/10.1049/cp:20000281
  5. V. Karasik, K. Dixon, C. Weber, B. Batchelder, G. Campbell, and Ribeiro, "SMES for Power Utility Applications: A Review of Technical and Cost Considerations," IEEE Trans. Applied Superconductivity, Vol.9, No.2, June 1999. https://doi.org/10.1109/77.783354
  6. Lin C. E., Shiao Y. S., Huang C. L. and Sung P., "Design Consideration and Economical Evaluation Battery Energy Storage System", 92 IEEE PESSummer Meeting, SM 431-7 PWRS, Seattle Washington, July 1992.
  7. H. Kirkham & R. Das, "Effects of Voltage Control in Utility Interactive Dispersed Storage and Generation Systems", IEEE Trans. Power Apparatus and Systems, Vol. PAS-103, No.8, 1984. https://doi.org/10.1109/TPAS.1984.318543
  8. Vasilije P. Lulcic, "Optimal Operation Policy for Storage", IEEE Trans. PAS-101, No.9, 1982. https://doi.org/10.1109/TPAS.1982.317586
  9. James J. Burke, "Power Distribution Engineering", Dekker, Inc. pp. 320-348, 1994.
  10. H. Lee Willis, "Power Distribution PlanningBook", Marcel Dekker, Inc. pp. 185-228.
  11. 노 대석 외, "신재생에너지전원이 연계된 배전 계통에서 보호협조방안에 관한 연구", 한국산학기술학회, 춘계학술회 논문집, 5월, 2008
  12. 노 대석, "배전계통에 있어서 전압변동이 일반 수용가에 미치는 영향에 대한 분석", 한국산학기술학회, 추계학술회 논문집, 11월, 2008.
  13. 노대석 외, "태양광발전이 연계된 배전선로의 리클로져의 오동작에 대한 연구", 한국산학기술학회, 춘계학술회 논문집, 5월, 2009.
  14. 노대석 외, "신에너지전원이 연계된 배전계통의 양방향 보호협조 문제점에 대한 연구", 대한전기학회, 하계학술회 논문집, 7월, 2009.