Abstract
A optimal reinforcement in the joint rock slope excavation adjacent to an existing tunnel would be influenced by excavation distance from the tunnel, slope angel, and joint conditions but has been empirically determined so far. In this study, large scale model tests were conducted to find out the relationship between load translation on the excavation surface and bebavior of the tunnel according to excavation steps of the jointed rock slope. Consequently, two main parameters, joint dip and sloped angle were investigated in those model tests. From the test results, it was found that tunnel deformation was the largest one when the excavation of joints located closer to the tunnel crown or invert. Stability of the slope and the tunnel were varied in a certain excavation stage related to the angle of slope. In the future, based on results of this study the reinforcement method for the tunnel and slope safety in a jointed rock mass will be demonstrated.
기존 터널에 근접하여 절리암반 굴착시 사면의 적절한 보강방법 및 시기는 굴착사면과 터널과의 근접도, 굴착사면 경사는 물론 절리상황에 의해 영향을 받자만 현재까지는 경험적으로 결정되고 있다. 본 연구에서는 터널에 근접하여 절리암반 지반을 굴착시 굴착단계에 따른 굴착사변에서의 하중전이 특성과 터널거동과의 상관관계를 분석하기 위하여 절리각도와 굴착사면 경사를 영향인자로 한 대형 모형시험을 실시하였다. 시험결과, 터널변형은 터널 천정부 또는 바닥부에 근접한 절리면 굴착시 가장 크게 발생을 하였으며, 사면과 터널의 안정성은 굴착사면의 경사와 관련하여 굴착단계에 따라 변화하였다. 향후 본 연구결과를 활용하여 절리암반에서의 터널과 사면의 보강방안을 도출하고자 한다.