Abstract
Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.
최근 도심재생사업에 대한 관심과 연구가 활발히 진행되고 있다. 이는 기존 도시의 노후화된 건물과 저급화된 기반시설로 인해 파생되는 사회적 경제적 문제들을 새로운 도시개발 즉 재개발사업을 통해 해결하려는 노력의 일환이다. 그러나 도심재생사업은 사업에 관계되는 다양하고 복잡한 이해관계자들과 규모의 방대함으로 수많은 위험에 노출되어 있어 사업의 성과를 보장할 수 없다는 특징을 가지고 있다. 본 연구는 도심재생사업과 같은 메가 프로젝트의 성과관리를 함에 있어, 기존의 비용/공정 중심의 성과측정체계를 위험관리 관점으로 확장시킴으로서 메가 프로젝트에 대한 종합 성과관리의 효율성을 향상시키기 위한 목적으로 위험성과지수 방법론을 제시하였다. 본 연구에서 제시한 위험성과지수 방법론은 기존의 EVMS와 유사한 체계를 갖추고 있고, 위험성과지수를 구성하는 18종류의 세부지수와 변수를 통해 비용/공정/위험의 3차원적 통합 성과관리가 가능하게 하였다.