References
- American Production and Inventory Control Society (APICS) (1998), Dictionary, Alexandria, VA, 9th ed.
- Bermudez, J. (1998), Advanced planning and scheduling: Is it as goods as it sounds?, The report on supply chain management, Advanced Manufacturing Research, 1-24.
- Bertrand, J. W., Zuijderwijk, M. M., and Hegge, H. M. H. (2000), Using hierarchical pseudo bills of material for customer order acceptance and optimal material replenishment in assemble to order manufacturing of non-modular products, Int. J. Prod. Econ., 66, 171- 184.
- Chen, C. Y., Zhao, Z. Y., and Ball, M. O. (2001), Quantity and due date quoting available to promise, Inform. Syst. Front., 3(4), 477-488.
- Chen, C. Y., Zhao, Z. Y., and Ball, M. O. (2002), A model for batch advanced available-to-promise, Prod. Oper. Manag., 11(4), 424-440.
- Fleischmann, B. and Meyr, H. (2003), Customer orientation in advanced planning systems, In: Dyckhoff, H., Lackes R., Reese, J. (Eds.), Supply Chain Management and Reverse Logistics, Springer, Berlin et al., 297-321.
- Guerrero, H. H. (1991), Demand management strategies for assemble-to-order production environments, Int. J. Prod. Res., 29(1), 39-51.
- Gunther, H. O. (2004), Supply chain management and advanced planning systems: A tutorial, in Proceedings of the 33rd International Conference on Computers and Industrial Engineering, Jeju, Korea, 25- 27.
- Harris, F. H. deB. and Pinder, J. P. (1995), A revenue management approach to demand management and order booking in assemble-to-order manufacturing, J. Oper. Manag., 13, 299-309.
- Jeong, B., Sim, S. B., Jeong, H. S., and Kim, S. W. (2002), An available-to-promise system for TFT LCD manufacturing in supply chain, Comput. Industrial Eng., 43, 191-212.
- Jung, H., Song, I., Jeong, B., and Yoo, W. (2003), An optimized ATP (Available-to-promise) system for make-to-order company in supply chain environment, Int. J. Industr. Eng., 10(4), 367-374.
- Kilger, C. and Schneeweiss, L. (2005), Demand fulfilment and ATP, In: Stadtler H., Kilger, C. (Eds.), Supply Chain Management and Advanced Planning Concepts, Models, Software and Case Studies, Springer, Berlin, 179-195.
- King, B. E. and Benton, W. C. (1988), Master production scheduling, customer service and manufacturing flexibility in an assemble-to-order environment, Int. J. Prod. Res., 26(6), 1015-1036.
- Lin, J. T. and Chen, J. H. (2005), Enhance order promising with ATP allocation planning considering material and capacity constraints, J. Chinese Inst. Industr. Eng., 22(4), 282-292.
- McClelland, M. K. (1988), Order promising and master production schedule, Decis. Sci., 19(4), 858-879.
- Ozdamar, L. and Yazgac, T. (1997), Capacity driven due date settings in make-to-order production systems, Int. J. Prod. Econ., 49, 29-44.
- Pibernik, R. (2005), Advanced available-to-promise: classification, selected methods and requirements for operations and inventory management, Int. J. Prod. Econ., 93-94, 1015-1036.
- Rudberg, M. and Wikner, J. (2004), Mass customization in terms of the customer order decoupling point, Prod. Plan. Control, 15(4), 445-458.
- Xiong, M. H., Tor, S. B., Khoo, L. P., and Chen, C. H. (2003a), A web-enhanced dynamic BOM-based available-to-promise system, Int. J. Prod. Econ., 84, 133-147.
- Xiong, M. H., Tor, S. B., and Khoo, L. P. (2003b), WebATP: a Web-based flexible available-to-promise computation system, Prod. Plan. Control, 14(7), 662- 672.
- Tamura, T. and Fujita, S. (1995), Designing customer oriented production planning system (COPPS), Int. J. Prod. Econ., 41, 377-385.
- Taylor, S. G. and Plenert, G. J. (1999), Finite capacity promising, Prod. Invent. Manage. J., 40(3), 50-56.
- Ware, N. and Fogarty, D. W. (1990), Master schedule / master production schedule: the same or different?, Prod. Invent. Manage. J., 31(1), 34-38.
- Yeh, C. H. (2000), A customer-focused planning approach to make-to-order production, Industr. Manage. Data Syst., 100(4), 180-187.