DOI QR코드

DOI QR Code

Consideration on the Preparation of Current Meters for Deep-sea Mooring and Cause of Mooring Recovery Failures

유속계 심해계류 준비 및 유속계 회수 실패원인에 관한 고찰

  • 황상철 (한국해양연구원 기후.연안재해연구부)
  • Published : 2008.06.30

Abstract

An interest in deep-sea measurements has been gradually increased in association with global warming and the need for deep-sea resources development. Long-term mooring of current meters has been recently conducted primarily for these purposes. In general, current meters equipped on a mooring line are deployed and recovered for a planned period in the sea. This paper describes all the preparations for deep-sea mooring. It also reviews the possible causes of the failures of recovery, which occasionally happens in the sea.

Keywords

References

  1. 石井秀夫, 崎高茂, 田代昭正, 長濱智基, 川健和雄. 1982. 海流計測用海中ブイの設計及び取扱いに關する覺書. 九州大學校 應用力學硏究所報. 56, 101-119
  2. 崎高茂, 田代昭正, 長濱智基, 石井秀夫, 川健和雄. 1982. 單点繫留式海中ブイの2次元靜的計算法. 九州大學校 應用力學硏究所報. 56, 121-131
  3. 황상철, 장경일, 석문식, 장영석. 2002. 해류계 계류에 의한해류관측: 천해계류. 한국해양학회지 바다. 7(4), 286-303 p
  4. 황상철, 전호경, 함석현. 1986. 1986년 동해심층해류 관측을 위한 유속계 계류보고. Ocean Res., 8(2), 63-74 https://doi.org/10.1016/S0141-1187(86)80034-7
  5. Aanderaa Instruments. 1993. Operating Manual. Aanderaa Instruments, Bergen. Technical Description No.159
  6. Berteaux, H.O. 1975. Buoy Engineering. John Wiley & Sons, New York. 314 p
  7. The Crosby Group, Inc. 1995. General catalog: Blocks & fittings for wire rope & chain. The Crosby Group, Inc. 53-55