DOI QR코드

DOI QR Code

Life Cycle Cost Method by Segregation of Safety and Function

기능특성을 고려한 생애주기 비용함수

  • 이준구 (한국농촌공사 강화지사) ;
  • 김한중 (한경대학교 지역자원시스템공학과) ;
  • 윤성수 (충북대학교 지역건설공학) ;
  • 최원 (서울대학교 지역시스템공학) ;
  • 이형진 (서울대학교 지역시스템공학) ;
  • 김종옥 (공주대학교 지역건설공학) ;
  • 정남수 (공주대학교 지역건설공학) ;
  • 이정재 (서울대학교 생태조경.지역시스템공학부)
  • Published : 2008.11.30

Abstract

An advanced model for assessing life cycle cost of the facility containing several subdivisions has been proposed with systems engineering approach. This model evaluates the maintenance cost in the sphere of the safety as well as in that of its functionality. The proposed approach has been shown to be more reasonable and practical than existing models. The serviceability and reasonability have been proved through evaluating life cycle cost of the reservoir which is a representative agricultural facility. In addition, the proposed method is helpful to make a maintenance strategy using the survival probability in the point of safety and functionality.

Keywords

References

  1. Chaaya, M. & A. Jaafaari, 2001, Cognizance of Visual Design Management in Life-Cycle Project Management, Journal of Management in Engineering, 17(1), pp.49-57 https://doi.org/10.1061/(ASCE)0742-597X(2001)17:1(49)
  2. Cho, H.-N., D.-H. Min & K.-M. Lee, 2001, Optimum Life-Cycle Cost Design of Orthotropic Steel Deck Bridges, Steel Structures
  3. Ehlen, Mark A., 1997, Life-Cycle Costs of New Construction Materials, Journal of Infrastructure systems, pp.129-133
  4. Engelund, S., D. S. John & B. Sorensen, 1999, Evaluation of Repair and Maintenance Strategies for Concrete Coastal Bridges on a Probabilistic Basis, ACI Material Journal, pp.160-167
  5. Farhey, Daniel N., R. Naghavi, A. Levi, Aniruddha M. Thakur, Mark A. Pickett, Douglas K. Nims & Emin A. Aktan, 2000, Deterioration Assessment and Rehabilitation Design of Existing Steel Bridge, Journal of Bridge Engineering, 5(1), pp.39-48 https://doi.org/10.1061/(ASCE)1084-0702(2000)5:1(39)
  6. Frangopol, Dan M. & H. Furuta, 2001, USJapan Workshop on Life-Cycle Cost Analysis and Design of Civil Infrastructure Systems, Reston, VA:ASCE
  7. Freyermuth, Clifford L., 2001, Life-Cycle Cost Analysis for Large Segmental Bridges, Concrete International, pp.89-95
  8. Fuller, Sieglinde K., 1996, Life-Cycle Costing Methodology, NIST
  9. Garboczi, Edward J., Dale P. Bentz & Geoffrey J. Frohnsdorff, 2000, Knowledge- Based Systems and Computational Tools for Concrete, Concrete International, pp.24-27
  10. Hong, H. P., 2000, Assessment of Reliability of Aging Reinforced Concrete Structures, Journal of Structural Engineering, 126(12), pp.1458-1465 https://doi.org/10.1061/(ASCE)0733-9445(2000)126:12(1458)
  11. Jung, S.-S. & J.-J. Yee, 2000, A Study on the Development of Software for Life Cycle Cost Evaluation of HVAC system, Journal of Architectural Institute of Korea-Planning and Design Committee, 16(7), pp.101-108
  12. Jung, S.-S. & D.-W. Kim, 2002, A Study on the Development of Cost Breakdown Structure in Present Worth Method and Annual Worth Method by HVAC system for systematic LCC Calculation, Journal of Architectural Institute of Korea-Structures Committee, 18 (6), pp.167-174
  13. Kay, Dianne H., Susan M. Morgan & S. N. Bodapati, 2001, Service Life of Illinois Highway Noise Barriers Projected from Current Condition Survey, Journal of Performance of Constructed Facilities, 15(3), pp.82-89 https://doi.org/10.1061/(ASCE)0887-3828(2001)15:3(82)
  14. Lee, S.-J., T.-K. Park, C.-S. Lee & Y.-I. Kim, 2002, A study on the Economic Evaluation Method for Remodeling of Deteriorated Military Facilities, Journal of Architectural Institute of Korea-Structures Committee, 18 (5), pp.105-112
  15. Liu, Min & Dan M. Frangopol, 2004, Optimal bridge maintenance planning based on probabilistic performance prediction, Engineering Structures, 26, pp.991-1002 https://doi.org/10.1016/j.engstruct.2004.03.003
  16. Oh, Y.-I., S.-B. Lee & T.-K. Lee, 1997, A Study on the Economic Analysis in Apartment House Based on Life Cycle Costing Techniques, Journal of Architectural Institute of Korea, 13(3), pp.325-333
  17. Park, S.-K. & Alfred H-S. Ang, 1997, Costeffective Reliability of RC structure in Korea under earthquake, Journal of Korea Concrete Institute, 9(5), pp.137-148
  18. Park, S.-K. 2001, LCC Optimization for Reinforced Concrete Structures under Seismic Hazards, KCI Concrete Journal, 13(2), pp. 26-32
  19. P.E., Susan M. Morgan, Dianne H. Kay P.E., & S. N. Bodapati P.E., 2001, Study of Noise Barrier Life-Cycle Costing, Journal of Transportation Engineering, 127(3), pp.230-236 https://doi.org/10.1061/(ASCE)0733-947X(2001)127:3(230)
  20. Ries, R. & A. Mahdavi, 2001, Integrated Computational Life-Cycle Assessment of Buildings, Journal of Computing in Civil Engineering, 15(1), pp.59-66 https://doi.org/10.1061/(ASCE)0887-3801(2001)15:1(59)
  21. Singh, Balaram K., 1996, How Significant is LCCA?, Concrete International, pp.59-62
  22. Violetta, B., 2002, Life-365 Service Life Prediction Model, Concrete International, pp. 53-57
  23. Yang, S.-I., 2001, REmaining Life Perdiction of Deteriorating Bridge Based on Lifetime System Reliability, Journal of Korean Society of Steel Construction, 13(5), pp.467-476
  24. Yang, S.-I., 2002, Lifetime Prediction of Existing Highway Bridges Using System Reliability Approach, Journal of Korean Society of Steel Construction, 14(2), pp.365-373
  25. Yang, S.-I., 2002, Optimum Maintenance Strategy of Bridges Based on System Reliability, Journal of Korean Society of Steel Construction, 14(5), pp.627-639
  26. Yang, S.-I., 2002, Time Dependent Maintenance Models of Bridges, Journal of Korean Society of Steel Construction, 14(3), pp.443-452