Abstract
Generally, project audit provides the service which accomplishes a project successfully by checking the management activity of information system project, indicating a controversial point and reflecting the improvement issues based on project audit check list. In addition, the projects are managed by using the project management maturity model based on process. However, the effect is not big as we except projects performance of real world. In this paper. to solve these problems, the project management maturity evaluation model which is connected with project audit check list and organizational maturity model survey items is designed. Thus, we propose the model which can improve the project performance through the project evaluation of customer's project and development part and the evaluation of organization level as we design that it is possible to not only audit the project but also evaluate it before and after the project.
일반적으로 프로젝트 감리는 프로젝트 관리 점검 항목을 기반으로 정보 시스템 프로젝트의 관리 활동을 검토하고 문제점을 지적하여 개선 사항을 반영하게 함으로써 프로젝트를 성공적으로 수행하기 위한 관련 서비스를 제공하고 있으며, 프로젝트 수행 조직은 프로세스 기반의 조직 성숙도 모델들을 적용하여 프로젝트를 관리하고 있다. 그러나, 실제 프로젝트 수행 단계에서는 기대 만큼 효과가 크지 않다. 본 논문에서는, 이를 해소하기 위한 방안으로 프로젝트감리검토항목을 조직 성숙도 모델 설문 항목과 연계하여 조직 성숙도 평가 모델을 설계함으로써 감리 결과뿐만 아니라 프로젝트 전이나 이후에도 평가를 가능하게 하여 프로젝트 발주기관 및 개발 기관의 프로젝트 평가와 프로젝트 수행에 대한 조직 수준의 평가를 통해 프로젝트 수행 역량 개선이 가능한 모델을 제시하였다.