This technical paper is proposing a sound concept in the application of the rehabilitation method of the water supply steel pipe in the large diameter ranged from 1,800mm to 3,500mm. There were conducted the experimental tests for the specimens as well as the real steel pipe of diameter 2,200mm. The water pressure ejected from nozzle tip should be at least 2,500bar to have the satisfied surface profiles required in the design criterion. The most difficult thing is to keep the water pressure at the nozzle tip as 2,500bar during the consecutive work in the interval of the work site more than 1km. It is found that the method suggested in this study is adequate method to meet the specified design criteria. The results of this study provide the useful information how to setup the equipments for the successful work. This method also provides not only the omission of the blasting process but also the effect of the budget reduction.