Abstract
Understanding of the length of time required to realize the return on the investment of informatization is important for policy makers and decision makers of information system adoption. Previous researchers, however, assessed this issue with the performance measurement approach that was primarily based on static point of view. However, the static analysis on the outcome of the informatization investment is limited in measuring the priori and ex ante effects of the informatization implementation on temporal basis. This study present a methodology to capture the outcome of the informatization investment on dynamic basis. This assessment was performed based on an e-government project in Korea, called "Industry Human Resource Project." Particularly, the study addressed how long it takes to obtain the benefit of WorkNet System, which was part of this Korean e-government project. We proposed various approaches to illustrate the importance and temporal effect of the WorkNet System by analyzing DB data, time reduction of WorkNet business processes and return of investment of IT.
정보화 사업에 대한 투자성과가 언제부터 어떻게 나타날 것인가의 시차 연구는 정책개발 및 정보시스템 도입 시 의사결정에 중요한 연구이다. 그러나 대부분의 정보화 성과평가 방법론들은 평가시점에 따라 사전/과정/사후평가의 한 시점에서 평가할 뿐 시간 경과에 따른 정보를 제공하는데는 한계가 있다. 이에 본 연구에서는 정보화 효과 분석 및 시차와 관련한 선행연구들을 살펴보고 전자정부 사업의 일환으로 추진된 산업인력정보화 사업의 워크넷 시스템에 대한 시차효과를 파악하는 방법론을 제시하고, 이를 실증 분석하였다. 본 연구에서는 DB 데이터를 이용한 시차분석, 이용자들의 업무프로세스 분석을 통한 시차분석, IT투자 대비 효과를 이용한 시차분석 등 다양한 관점에서 시차효과 분석방법을 제시하였다. 또한 다양한 시차효과 분석방법을 국가인적자원개발 및 노동시장활성화를 지원하는 워크넷에 적용하여 검증을 시도하였다. 본 연구를 통해 시차분석을 위한 몇 가지 방법론을 제시하였으며, 산업인력 정보화사업의 성과가 시차를 두고 향상되었다는 것을 발견하였으며, 정보화와 성과 간에 발생하는 시차현상의 존재 가능성에 대한 시사점을 제시하였다.