Degree of Overlapping Design Activities in Vehicle Development:A System Dynamics Approach

  • Published : 2007.08.30

Abstract

The vehicle development process (VDP) is iterative in nature with numerous interactions and information flows between design groups and between development phases. The VDP has been changed from a sequential-functional development to a concurrent-team based approach. Concurrent execution of design activities may reduce the development lead-time, but it increases the managerial complexity in the VDP. A system dynamics model was developed to understand the transient behavior of parallel, overlap, and sequential processes in the VDP and to determine the optimal level of overlapping considering the development lead-time and total number of reworks. The simulation results showed that different execution processes should be used, depending upon the intensity of reworks.

Keywords

References

  1. Krishnan, V.(1996), 'Managing the simultaneous execution of coupled phases in concurrent product development,' IEEE Transactions on Engineering Management, Vol. 43, No.2
  2. Clark, K. B. and Fujimoto, T.(1991), 'Product development performance: strategy, organization, and management in world auto industry,' Harvard Business School Press. Cambridge. MA
  3. Imai, K., Nonaka, I., and Takeuchi, H.(1985), 'Managing the new product development process: how the Japanese companies learn and unlearn,' In: Clark KB, Hayes RH and Lorenz C (2nd eds). The Uneasy Alliance. Harvard Business School Press. Cambridge. MA
  4. Takeuchi, H. and Nonaka, I.(1986), he new product development game. Harvard Business Review, January-February, pp. 137-146
  5. Wheelwright, S. C. and Clark, K. B.(1992), evolutionizing Product Development. The Free Press, New Your
  6. Eisenhardt, K. M. and Tabrizi, B. N.(1995), ccelerating adaptive processes: product innovation in the global computer industry. Admin Sci Quarterly, Vol. 40, pp. 84-110 https://doi.org/10.2307/2393701
  7. Terwiesch, C., Loch, C. H., and Niederkofler, M.(1996), anaging tradeoffs in concurrent engineering. Presented at the Third EIASM International Product Development Conference, pp. 693-706
  8. Loch, C. H. and Terwiesch, C.(1998), Communication and uncertainty in concurrent engineering. Management Science, Vol. 44, No.8, pp. 1032-1048 https://doi.org/10.1287/mnsc.44.8.1032
  9. Krishnan, V., Eppinger, S. D., and Whitney D. E.(1995), Accelerating product development by the exchange of preliminary product design. Journal of Mechanical Design, Vol. 117, pp. 491-497 https://doi.org/10.1115/1.2826709
  10. Ford, D. N.(1995), The dynamics of project management. PhD Thesis. MIT
  11. Blackburn, J. D.(1991), New product development: the new time wars. In: Time-based competition: the next battleground in American manufacturing. Business One Irwin. Homewood. IL
  12. Ha, A. Y. and Porteus, E. L.(1995), Optimal timing of reviews in concurrent design for manufacturability. Management Science, Vol. 41, No.9
  13. Cooper, K. G.(1993), The iteration cycle: benchmarks for the project manager. Project Management Journal, Vol. 24, No. 1
  14. Richardson, G. P. and Alexander, P. L.(1981), Introduction to system dynamics modeling with Dynamo. MIT Press. Cambridge. MA
  15. Roberts, E. B.(1974), A simple model of R&D project dynamics. R&D Management. Vol. 5, No.1 https://doi.org/10.1111/j.1467-9310.1974.tb01217.x
  16. Steward, D. V.(1981), The design structure system: a method for managing the design of complex systems. IEEE Transactions on Engineering Management, Vol. 28, No.3
  17. Eppinger, S. D.(1991), Model-based approaches to managing concurrent engineering. Journal of Engineering Design, Vol. 2, No.4
  18. Kusiak, A. and Wang, J.(1993), Efficient organizing of design activities. International Journal of Production Research, Vol. 31, No.4
  19. Rodrigues, A. and John, B.(1996), system dynamics in project management: a comparative analysis with traditional methods. System Dynamics Review, Vol. 12, No.2, pp. 121-139 https://doi.org/10.1002/(SICI)1099-1727(199622)12:2<121::AID-SDR99>3.0.CO;2-X
  20. Williams, T., Eden, C., Ackermann, F., and Tait, A.(1995), Vicious circles of parallelism. International Journal of Project Management, Vol, 13, No.3, pp. 151-155 https://doi.org/10.1016/0263-7863(95)00034-N
  21. Huot, J. C.(1991), Concurrency in major projects. AACE Transactions