The Efficiency Evaluation of One Person Non-Prism Surveying System for Tunnel Measurement

터널계측을 위한 1인 무프리즘 측량시스템의 효율성 평가

  • 박경식 (인하공업전문대학 항공지형정보시스템과) ;
  • 함창학 (인하공업전문대학 항공지형정보시스템과) ;
  • 이재기 (충북대학교 토목공학과)
  • Published : 2007.12.31

Abstract

The tunnel measurement data such as deficiency quantity, outbreak quantity, inner displacement and crown settlement are very important elements in tunnel sites under construction and obtained mostly by displacement gauge and total station. However, it is difficult and dangerous to install targets or measurement equipments on the points in tunnel construction site and also we need several persons to work in the tunnel. Non-prism total station with remote control system which is developed recently has various efficient functions for tunnel measurement. Therefore, for efficient tunnel measurement, this study suggested one person surveying system which consisted of non-prism total station and notebook PC to control total station remotely, and we evaluated the suggested tunnel measurement system. In this study, the tunnel site under construction was chosen as the test field and tunnel surveying was done by existing surveying method and suggested method separately. As result of the test, we analyzed processing time and accuracy to demonstrate the superiority of suggested one person non-prism surveying system.

터널시공현장에서 중요한 요소가 되는 미굴량과 여굴량, 그리고 내공변위 및 천단침하에 대한 자료는 대부분 변위계와 토탈스테이션에 의해 취득되어진다. 그러나 이러한 장비들은 다수의 작업자를 필요로 하고, 대상지점에 직접 접근하여 타겟이나 계측기를 설치해야 되는 등 여러 가지 불편함과 위험요소를 안고 있다. 최근에 개발된 리모트컨트롤 무프리즘 토탈스테이션은 이러한 단점을 해소할 수 있는 여러 가지 기능을 가지고 있다. 따라서 본 연구에서는 무프리즘 토탈스테이션과 제어용 노트북 컴퓨터 등을 조합하여 터널계측을 위한 1인 측량시스템을 구성하고 그 효율성을 평가하고자 하였다. 이를 위해 시공 중인 터널을 대상으로 기존의 측량방법과 본 연구의 측량방법으로 각각 관측을 수행하고 관측 소요시간, 정확도 등을 비교하였고 그 결과 본 연구의1인 무프리즘 측량시스템이 기존의 방법에 비해 효율적임을 입증하였다.

Keywords