Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집)
- Volume 9 Issue 1
- /
- Pages.91-97
- /
- 2007
- /
- 2233-8292(pISSN)
- /
- 2287-4747(eISSN)
Pillar load and ground deformation in 2-arch tunnel in the jointed rock mass
절리암반에서 2-Arch 터널의 필라하중과 지반변위
Abstract
Loads on the pillar and ground deformation in 2-arch tunnel, which is excavated in the rock mass with regular discontinuities, depending on the dips of discontinuities and the construction sequences were experimentally studied. Large scale model tests in the biaxial test facility were performed. Tested model (width 3.3m, height 3.0m, and length 0.45m) for 2-arch tunnel in 1/10 scale were built with various dips. Test results show that discontinuities have greate affects on the behavior of the 2-arch tunnel, especially on the pillar loads and ground deformation.
절리가 존재하는 암반에서 2-Arch 터널을 굴착할 때 절리방향과 굴착단계에 따른 필라하중의 변화를 실험적으로 연구하였다. 이를 위해, 대형 모형 실험기(폭 3.3m, 높이 3.0m, 길이 0.45m)에 1/10 크기의 2-Arch 모형터널을 갖는 다양한 각도의 절리를 포함한 지반을 조성하고, 실제 시공과정을 따라 굴착하면서 터널굴착으로 인한 터널 주변지반의 변형을 측정하고, 굴착단계에 따라 필라에 작용하는 하중을 측정하였다. 계측된 데이터로부터 2-Arch 터널의 굴착에 따른 거동을 분석한 결과 절리의 각도에 따라 굴착단계별로 터널 주변지반의 변형 및 필라에 작용하는 하중이 크게 영향을 받는 것을 확인하였다.
Keywords