References
- R. Billinton, J. Oteng-Adjei, R. Ghaja, 'Comparison of Two Alternative Methods to Establish an Interrupted Energy Assessment Rate', IEEE, Trans. on Power Systems, Vol. PWRS-2, No. 3, 1987
- M.J. Sullivan, 'Interruption Costs, Customer Satisfaction and Expectations for Service Reliability', IEEE Trans. on Power Systems, Vol. 11, No. 2, 1996 https://doi.org/10.1109/59.544676
- Koichi Nakamura, Susumu Yamashiro, 'A Survey Study on Estimation of Customer Interruption Costs', T. IEE Japan, Vol. 119-B, No. 2
- Koichi Nakamura, Susumu Yamashiro, 'A Study on the Estimation of Power System Reliability taking into account Interruption Costs', PE-97-61
- S.B. Choi, 'A Study to Investigate Industrial Customers Interruption Cost for Power System Planning in Korea', KERI, R&D Project, Report R- 2005-0-001-01, 2005
- R. Billinton, Allan. R.N, 'Power System Reliability in Prospective', IEE J. Electron. Power, Vol. 30, Mar. 1984
- Allan. R.N, R. Billinton and Shale, 'Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1977-1982', IEEE Trans. On Power Apparatus and Systems, Vol. PAS- 103, No. 2, Feb. 1984 https://doi.org/10.1109/TPAS.1984.318502
- Billinton, J. Oteng-Adjei, R. Ghaja, 'Comparison of Two Alternative Methods to Establish an Interrupted Energy Assessment Rate', IEEE, Trans. on Power Systems, Vol. PWRS-2, No. 3, August 1987
- M. J. Sullivan, 'Interruption Costs, Customer Satisfaction and Expectations for Service Reliability', IEEE Trans. on Power Systems, Vol. 11, No. 2, May 1996 https://doi.org/10.1109/59.544676
- Koichi Nakamura, Susumu Yamashiro, 'A Survey Study on Estimation of Customer Interruption Costs', T. IEE Japan, Vol. 119-B, No. 2
- Arun P. Sanghvi, 'Measurement and Application of Customer Interruption Cost/Value of Service for Cost-Benefit Reliability Evaluation: Some Commonly Based Issues', IEEE Trans. on Power Systems, Vol. 5, No. 4, Nov. 1990
- K. Nakamura, S, Yamashiro, 'A Survey Study on Estimation of Customer Interruption Costs', T. IEE Japan, Vol. 119-B, No. 2
- N. Balu, M. Lauby, 'Cost-Benefit Analysis of Power System Reliability: Determination of Interruption Costs', EPRI EL-6791s Vol. 1-3, 1990
- Billinton, Allan. R.N, 'Reliability Evaluation of Engineering Systems Concepts and Techniques', 2nd Edition, Plenum Press, New York, 1992
Cited by
- Reliability Evaluation of Customers in a Microgrid vol.23, pp.3, 2008, https://doi.org/10.1109/TPWRS.2008.926710