Optimization of Nitrogen and Phosphorus Removal of Temporal and Spatial Isolation Process by Model Simulation System

시공간 동시분할 공정 시뮬레이션을 통한 질소 및 인 제거 최적화 방안

  • Ryu, Dongjin (Department of Environ. Engineering, Konkuk University) ;
  • Chang, Duk (Department of Environ. Engineering, Konkuk University/Innovative Environmental Technology Center) ;
  • Shin, Hyungsoo (Department of Environ. Engineering, Konkuk University) ;
  • Park, Sangmin (Department of Environ. Engineering, Konkuk University) ;
  • Hong, Kiho (Department of Environ. Engineering, Konkuk University) ;
  • Kim, Sooyoung (Department of Environ. Engineering, Konkuk University) ;
  • Kim, Myoungjun (Department of Environ. Engineering, Konkuk University)
  • 유동진 (건국대학교 공과대학 환경공학과) ;
  • 장덕 (건국대학교 공과대학 환경공학과/차세대환경기술센터) ;
  • 신형수 (건국대학교 공과대학 환경공학과) ;
  • 박상민 (건국대학교 공과대학 환경공학과) ;
  • 홍기호 (건국대학교 공과대학 환경공학과) ;
  • 김수영 (건국대학교 공과대학 환경공학과) ;
  • 김명준 (건국대학교 공과대학 환경공학과)
  • Received : 2006.09.06
  • Accepted : 2007.01.18
  • Published : 2007.03.30

Abstract

The objective of this study was to establish the optimal system operating strategies for nitrogen and phosphorus removal through model simulation system built for advanced wastewater treatment targeting on simultaneous temporal/special phase isolation BNR process. The simulation system was built with unit process modules using object modules in GPS-X code. The system was well verified by field experiment data. Simulation study was carried out to investigate performance response to design and operation parameters, i.e. hydraulic retention time (HRT), solids retention time (SRT), and cycle time. The process operated at HRTs of 10~15 hours, longer SRTs, and cycle time of 2 hours showed optimal removal of nitrogen. The HRTs of 10~15 hours, SRTs of 20~25 days, and longer cycle time was optimal for phosphorus removal. Both simulation and field studies showed that optimal operating strategies satisfying both the best nitrogen and phosphorus removals include HRTs ranged 10~15 hours, SRTs ranged 20~25 days, and cycle times of 4~8 hours. The simulation system with modularization of generalized components in BNR processes was, therefore, believed to be a powerful tool for establishing optimal strategies of advanced wastewater treatment.

Keywords

Acknowledgement

Supported by : 서울지역환경기술개발센터

References

  1. 이성학, 박종복, 고주형, 임정훈, 우혜진, 김창원, 변형 생물학적 고도처리공정에서 ASM2d를 이용한 민감도 분석 및 온도/SRT 영향 평가, 대한환경공학회지, 26(1), pp. 83-88 (2004)
  2. 전항배, 신항식, 생물학적 과잉 인제거 특성 발현 및 영향 인자에 대한 연구, 대한환경공학회지. 17(1), pp. 77-84 (1995)
  3. 정형석, 이상형, 임재림, 신항식, 인 제거 모델 분석을 통한 매개 변수 추정방법의 제시, 대한토목학회지, 25(18), pp 59-67 (2005)
  4. 환경부, 수질오염공정시험방법, 서울 (2000)
  5. Abusam, A., Keesman, K. J., Spanjers, H., van Stratcn, G. and Meinema, K., Evaluation of Control Strategies Using an Oxidation Ditch Benchmark. Water Science and Technology, 45(4-5), pp. 151-158 (2002)
  6. American Public Health Association, American Water Works Association, Water Environmental Federation, Standard Methods for the Examination of Water and Wastewater, 21th edition, APHA, Washington, D.C. (2005)
  7. Casellas, M., Dagot, C, Stelmach, S., Pons, M. N. and Baudu, M., Setting-up a Control Simulation Strategy for a Sequencing Batch Reactor(SBR): Application to Municipal Wastewater, Water Science and Technology, 47(1), pp. 297-302 (2002)
  8. Hao, X., van Loosdrecht, M. C. M., Meijer, C. F., Heijnen, J. J. and Qian, Y., Model-based Evaluation of Denitrifying P Removal in a Two-Sludge System, Journal of Environmental Engineering, 127(2), pp. 112-118 (2001) https://doi.org/10.1061/(ASCE)0733-9372(2001)127:2(112)
  9. Henze, M., Gujer, W., Mino, T., Matsuo, T., Wentzel, M. C, Marais, G. v. R. and van Loosdrecht, M. C. M., Activated Sludge Model No. 2, Water Science and Technology, 39(1), pp. 61-68 (1999)
  10. Hvala, N., Vrecko, D., Burica, O., Strazar, M. and Levstek, M., Simulation Study Supporting Wastewater Treatment Plant Upgrading, Water Science and Technology, 46(4-5), pp. 325-332 (2002)
  11. Hydromantis, GPS-X Technical Reference, Hydromantis, Canada (2001)
  12. Mamais, D. and Jenkins, D., The Effects of MCRT and Temperature on Enhanced Biological Phosphorus Removal, Water Science and Technology, 26(5), pp. 955-965 (1992) https://doi.org/10.2166/wst.1992.0537
  13. Manga, J., Ferrer, J., Seco, A. and Garcia-Uasch, F., Design of Nutrient Removal Activated Sludge Systems, Water Science and Technology, 47(11), pp. 115-122 (2003)
  14. Nelder, J. A. and Mead, R., A Simplex Method for Function Minimization, Computer Journal, 7, pp. 308-313 (1965) https://doi.org/10.1093/comjnl/7.4.308
  15. Nuhoglu, A., Keskinler, B. and Yildiz, E., Mathematical Modeling of the Activated Sludge Process-the Erzincan case, Process Biochemistry, 40, pp. 2467-2473 (2005) https://doi.org/10.1016/j.procbio.2004.09.011
  16. Randall, C. W., Barnard, J. L. and Stensel, H. D., Design and Retrofit of Wastewater Treatment Plants for Biological Nutrient Removal, Technomic Publishing Co., Inc., Lancaster (1992)
  17. Rcddy, M., The Concept of Phosphorus Storage Capability and its Implications for Design of Systems for Enhanced Biological Uptake of Phosphate, Water Science and Technology, 23, pp. 577-584 (1991)
  18. Stamou, A., Katsiri, A., Mantziaras, I., Boshnakov. K.., Kou-manova, B. and Stoyanov, S., Modeling of an Alternating Oxidation Ditch System, Water Science and Technology, 39(4), pp. 169-176 (1999)
  19. U.S. Environmental Protection Agency, Process Design Manual for Nitrogen Control. EPA/625/R-93/010, Washington, D.C, pp. 211-247 (1993)
  20. Vrecko. D., Hvala, N., Kocijan, J. and Zec, M., System Analysis for Optimal Control of a Wastewater Treatment Benchmark, Water Science and Technology, 43(7), pp. 199-206 (2001)