기술사 (Journal of the Korean Professional Engineers Association)
- 제39권6호
- /
- Pages.42-48
- /
- 2006
인천대교와 신기술들
New Technical Method in Incheon Bridge
초록
This is briefly to introduce about design and construction method newly adopted in Incheon bridge construction site. The Incheon Bridge Project are divided into 3 parts, that is Cable Stayed Bridge. Viaduct Bridge and Approach Bridge. In this paper, we will describe overview and construction sequence of each kind part.
키워드