패턴 클러스터링 기법에 기반한 배전 변전소 주변압기 사고복구 전략 설계

Design of Main Transformer Fault Restoration Strategy Based on Pattern Clustering Method in Automated Substation

  • 고윤석 (남서울대학 전자정보통신공학부)
  • 발행 : 2006.10.01

초록

Generally, the training set of maximum $m{\times}L(m+f)$ patterns in the pattern recognition method is required for the real-time bus reconfiguration strategy when a main transformer fault occurs in the distribution substation. Accordingly, to make the application of pattern recognition method possible, the size of the training set must be reduced as efficient level. This Paper proposes a methodology which obtains the minimized training set by applying the pattern clustering method to load patterns of the main transformers and feeders during selected period and to obtain bus reconfiguration strategy based on it. The MaxMin distance clustering algorithm is adopted as the pattern clustering method. The proposed method reduces greatly the number of load patterns to be trained and obtain the satisfactory pattern matching success rate because that it generates the typical pattern clusters by appling the pattern clustering method to load patterns of the main transformers and feeders during selected period. The proposed strategy is designed and implemented in Visual C++ MFC. Finally, availability and accuracy of the proposed methodology and the design is verified from diversity simulation reviews for typical distribution substation.

키워드

참고문헌

  1. C.S. Chang, T.S.Chung, 'An Expert System for On-Line Security-Economic Load Allocation on Distribution Systems,' IEEE Trans. on Power Delivery, Vol. 5, No. 1, PP 467-469, January 1990 https://doi.org/10.1109/61.107314
  2. Aoki, K., H. Kuwabara, T. Satoh, and M. Kanezashi, 'An Efficient Algorithm for Load Balancing of Transformers and Feeders by Switch Operation in Large Scale Distribution Systems,' IEEE Trans. on Power Systems https://doi.org/10.1109/61.193994
  3. Mori S., I.Hata, T.Usui and K. Morita, 'Expert System Supporting Substation Service Restoration,' ESAP IV, pp 131-136, January 1993
  4. Bernard J. P. and D. Durocher, 'An Expert System for Fault Diagnosis Integrated in Existing SCADA Systems,' IEEE Trans. on Power Systems, Vol. 9, No. 1, pp 548-554, February 1994 https://doi.org/10.1109/59.317567
  5. Power System Restoration Working Group, 'Special Consideration in Power System Restoration : The Second Working Group Report', IEEE Trans. on Power Systems, Vol. 9, No. 1, February 1994 https://doi.org/10.1109/59.317562
  6. Yang, Hong-Tzer, Wen-Yeay Chang, Ching-Lien Huang, 'On-Line Fault Diagnosis of Power Substation Using Connectionist Expert System', IEEE Trans on Power Systems,' Vol. 10, No. 1, February 1995 https://doi.org/10.1109/59.373914
  7. Kim, H., Y. Ko, and K. H. Jung, 'Algorithm of Transferring the Load of the Faulted Substation Transfomer using the Best-First Search Method,' IEEE Trans. on PWRD, Vol. 7, No. 3, pp 1434-1442, July 1992 https://doi.org/10.1109/61.141862
  8. 고윤석 '자동화된 변전소의 주변압기 사고복구를 위한 패턴 인식 기법에 기반한 실시간 모선 재구성 전략 개발', 전기학회논문지, Vol. 53, No. 11, pp. 596-603, 2004년 11월
  9. Luger, G.F. and Stubblefield, W.A. ARTIFICIAL INTELLIGENCE AND THE DESIGN OF EXPERT SYSTEM. the Beniman/Cummings Publishing Company, Inc
  10. Patterson, Dan W, INTRODUCTION TO ARTIFICIAL INTELLIGENCE AND EXPERT SYSTEMS, Prentice-Hall International Inc
  11. SIMENS, IEC61850을 적용한 변전소 자동화 파일롯 프로젝트