Browse > Article

Design of Main Transformer Fault Restoration Strategy Based on Pattern Clustering Method in Automated Substation  

Ko, Yun-Seok (남서울대학 전자정보통신공학부)
Publication Information
The Transactions of the Korean Institute of Electrical Engineers A / v.55, no.10, 2006 , pp. 410-417 More about this Journal
Abstract
Generally, the training set of maximum $m{\times}L(m+f)$ patterns in the pattern recognition method is required for the real-time bus reconfiguration strategy when a main transformer fault occurs in the distribution substation. Accordingly, to make the application of pattern recognition method possible, the size of the training set must be reduced as efficient level. This Paper proposes a methodology which obtains the minimized training set by applying the pattern clustering method to load patterns of the main transformers and feeders during selected period and to obtain bus reconfiguration strategy based on it. The MaxMin distance clustering algorithm is adopted as the pattern clustering method. The proposed method reduces greatly the number of load patterns to be trained and obtain the satisfactory pattern matching success rate because that it generates the typical pattern clusters by appling the pattern clustering method to load patterns of the main transformers and feeders during selected period. The proposed strategy is designed and implemented in Visual C++ MFC. Finally, availability and accuracy of the proposed methodology and the design is verified from diversity simulation reviews for typical distribution substation.
Keywords
Pattern Clustering; Pattern Recognition; Substation Automation System; Main Transformer Fault;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Patterson, Dan W, INTRODUCTION TO ARTIFICIAL INTELLIGENCE AND EXPERT SYSTEMS, Prentice-Hall International Inc
2 SIMENS, IEC61850을 적용한 변전소 자동화 파일롯 프로젝트
3 Bernard J. P. and D. Durocher, 'An Expert System for Fault Diagnosis Integrated in Existing SCADA Systems,' IEEE Trans. on Power Systems, Vol. 9, No. 1, pp 548-554, February 1994   DOI   ScienceOn
4 Power System Restoration Working Group, 'Special Consideration in Power System Restoration : The Second Working Group Report', IEEE Trans. on Power Systems, Vol. 9, No. 1, February 1994   DOI   ScienceOn
5 Yang, Hong-Tzer, Wen-Yeay Chang, Ching-Lien Huang, 'On-Line Fault Diagnosis of Power Substation Using Connectionist Expert System', IEEE Trans on Power Systems,' Vol. 10, No. 1, February 1995   DOI   ScienceOn
6 Kim, H., Y. Ko, and K. H. Jung, 'Algorithm of Transferring the Load of the Faulted Substation Transfomer using the Best-First Search Method,' IEEE Trans. on PWRD, Vol. 7, No. 3, pp 1434-1442, July 1992   DOI   ScienceOn
7 고윤석 '자동화된 변전소의 주변압기 사고복구를 위한 패턴 인식 기법에 기반한 실시간 모선 재구성 전략 개발', 전기학회논문지, Vol. 53, No. 11, pp. 596-603, 2004년 11월   과학기술학회마을
8 Luger, G.F. and Stubblefield, W.A. ARTIFICIAL INTELLIGENCE AND THE DESIGN OF EXPERT SYSTEM. the Beniman/Cummings Publishing Company, Inc
9 C.S. Chang, T.S.Chung, 'An Expert System for On-Line Security-Economic Load Allocation on Distribution Systems,' IEEE Trans. on Power Delivery, Vol. 5, No. 1, PP 467-469, January 1990   DOI   ScienceOn
10 Aoki, K., H. Kuwabara, T. Satoh, and M. Kanezashi, 'An Efficient Algorithm for Load Balancing of Transformers and Feeders by Switch Operation in Large Scale Distribution Systems,' IEEE Trans. on Power Systems   DOI   ScienceOn
11 Mori S., I.Hata, T.Usui and K. Morita, 'Expert System Supporting Substation Service Restoration,' ESAP IV, pp 131-136, January 1993