조립블록 지번할당 알고리즘 개발 : 현대중공업 사례

JIBUN (location) assignment algorithm for assembly blocks : A case of Hyundai Heavy Industries

  • 박창규 (울산대학교경영대학경영학부) ;
  • 서준용 (울산대학교경영대학경영학부)
  • 투고 : 20060400
  • 심사 : 20060600
  • 발행 : 2006.06.30

초록

It is a crucial managerial issue how to manage assembly blocks at shipyard. Based on the project experience in Hyundai Heavy Industries, this study points out the difficulties on the block stockyard operations, formalizes the JIBUN (location) assignment problem for assembly blocks, and develops the JIBUN (location) assignment algorithm whose purpose is to reduce the number of unproductive block moves. Through simulation experiments for various situations, this study demonstrates the usefulness of JIBUN (location) assignment algorithm. In addition, this study examines the impacts of block move sequence rules and of block stockyard layouts on the block stockyard operations.

키워드

참고문헌

  1. Ahn, S.S.(2002), A Study on the Efficient Operation of Block Storages at Shipyard: a Case of Hyundai Heavy Industries (in Korean), Master Thesis, University of Ulsan, Korea
  2. Brynzer, H. and Johansson, M.I.(1996), Storage location assignment: Using the product structure to reduce order picking times, International Journal of Production Economies, 46-47, 595-603
  3. Chew, E.P. and Tang L.C.(1999), Travel time analysis for general item location assignment in a rectangular warehouse, European Journal of Operational Research, 112, 582-597 https://doi.org/10.1016/S0377-2217(97)00416-5
  4. Kim, I.S. (2004), A Study on the Improvement of Logistics in Assembly Process of Shipbuilding InduStry (in Korean), Master Thesis, University of Ulsan,Korea
  5. Kim J.K. (2003), A Study on Solving Block Accumulation Appearance in Shipbuilding (in Korean), Technical Report, University of Ulsan, Korea
  6. Kim, S.U. and Yun, U.R.(1996), Master Plan for Improving Logistic System in Hyundai Heavy Industries (in Korean), Technical Report, Hyundai Reseatch Institute, Korea
  7. Kwon, S.T.(1999), A Study on the Improvement of Logistics in Shipbuilding Industry Applying SCM Theory and TOC Theory (in Korean), Master Thesis, University of Ulsan, Korea
  8. Murty, K.G., Liu, J ., Wan, Y. and Linn, R.(2005), A decision support system for operations in a container terminal, Decision Support Systems, 39, 309-332 https://doi.org/10.1016/j.dss.2003.11.002
  9. Park, C, Patk, J.C, Byeon, G.G., Kim, H.G. and Kim, J.(2006), Steel stock management on the stockyard operations in shipbuilding: A case of Hyundai Heavy Industries, Production Planning and Control, 17, 1-12 https://doi.org/10.1080/09537280500267969
  10. Park, Y.(2005), A Study on the Assembly and Erection Method of Mega Block for the Solution of Block Stork Overload in Shipbuilding Industry (in Korean), Master Thesis, University of Ulsan, Korea
  11. Preston, P. and Kozan, E.(2001), An approach to determine storage locations of containers at seaporr terminals, Computers and Operations Research, 28, 983-995 https://doi.org/10.1016/S0305-0548(00)00020-4
  12. Zhang, C, Liu, J., Wan, Y, Murry, K.G. and Linn, R.(2003), Storage space allocation in container terminals, Transportation Research Part B, 37, 883-903 https://doi.org/10.1016/S0191-2615(02)00089-9