Economic Feasibility on the Interconnected Electric Power System in North-East Asia

동북아 전력계통 연계에 따른 경제성 분석

  • 정구형 (홍익대학 전기정보제어공학과) ;
  • 한석만 (홍익대학 전기정보제어공학과) ;
  • 김발호 (홍익대학 전기정보제어공학과)
  • Published : 2006.02.01

Abstract

Interstate electric power system, as an alternative for energy cooperation under regional economic block, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., interconnection of electric power systems in this region may bring considerable economic benefits. This paper implements a mathematical optimization model, ORIRES, proposed by Russia, in analysing the economic feasibility of system interconnection. Additional analyses on the environmental impact of the system interconnection, and sensitivity of key factor inputs have been performed.

Keywords

References

  1. 산업자원부, 제2차 전력수급기본계획, 2004
  2. 에너지경제연구원, 동북아 에너지 협력 연구, 산업자원부, 2003
  3. 한국전력공사 전력경제처, 투자사업을 위한 경제성 평가(방법 및 절차서), 1994
  4. L.S.Belyaev, L.U.Chudinova, S.V.Podkovalnikov, and V.A.Saveliev, 'A mathematical model for effectiveness assessment of interstate electric ties in North-East Asia,' Proceedings of POWERCON '98, Beijing, China, Aug., 1998, pp.730-734 https://doi.org/10.1109/ICPST.1998.729061
  5. L.S.Belyaev, G.F.Kovalev, and S.V.Podkovalnikov, 'Effeciency assessment of 'Russia-China-South Korea' electric tie with power export from Prymorye nuclear power plant', Proceedings of 1996 World Energy System Conference, Canadian Institute World Energy System, Toronto, Canada, 1996, pp.3.4.1-3.4.6
  6. L.S.Belyaev, G.F.Kovalev, and S.V.Podkovalnikov, 'Ties in North-Eastern Asia', Perspectives in Energy, vol.3, 1994-1995, Pion Publication, pp.321-330
  7. B.A.McCarl, GAMS User Guide: 2003, Developed in cooperation with GAMS Development Corporation, Dec., 2002