References
- Aras, O. A. and Swanson, L. A. (1982), A lot sizing and sequencing algorithm for dynamic demands upon a single facility, journal of Operations Management, 2(3), 177-185 https://doi.org/10.1016/0272-6963(82)90005-5
- Barany I., Van Roy, T. J., and Wolsey, L. (1984), Strong formulations for multi-item capacitated lot sizing, Management Science, 30(10), 1255-1261 https://doi.org/10.1287/mnsc.30.10.1255
- Diaby, M., Bahl, H. C., Karwan, M. H., and Ziont, S. (1992), Capacitated lot-sizing and scheduling by lagrangean relaxation, European Journal of Operational Research, 59, 444-458 https://doi.org/10.1016/0377-2217(92)90201-J
- Diwakar Gupta, Thorkell Magnusson (2005), The Capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times, Computers & Operations research, 32, 727-747 https://doi.org/10.1016/j.cor.2003.08.014
- Drexl, A., Kimms, A. (1997), Lot sizing and scheduling-Survey and extensions, European Journal of Operational Research, 99, 221-235 https://doi.org/10.1016/S0377-2217(97)00030-1
- Eppen, G. D. and Martin, R. K. (1987), Solving multi-item capacitated lot-sizing problem using variable redefinition, Operations Research, 35, 832-848 https://doi.org/10.1287/opre.35.6.832
- Garey, M. and Johnson, D. (1979), Computers and intractability: A guide to the theory of NP-completeness, Freeman and Co., San Francisco
- Haase, K. (1996), Capacitated lot -sizing withsequence-dependent setup costs, OR Specktrum, 18, 51-59 https://doi.org/10.1007/BF01539882
- Kirkpatrick, S., Gelatt, Jr. C. D., and Vecchi, M. P. (1983), Optimization by simulated annealing, Management Science, 220, 671-680
- Kuik, R. and Salomon, M. (1990), Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic, European Journal of Operational Research, 45(1), 25-37 https://doi.org/10.1016/0377-2217(90)90153-3
- Mohan Gopalakrishnan, Ke Ding, Jean-Marie Bourijolly, and Srimathy Mohan (2001), A Tabu-Search Heuristic for the capapcitated lot-sizing problem with set-up carryover, Management science, 47(6), 851-863 https://doi.org/10.1287/mnsc.47.6.851.9813
- Ou Tang (2004), Simulated annealing in lot sizing problmes, Int. J. Production Economics, 88, 173-181 https://doi.org/10.1016/j.ijpe.2003.11.006
- Salomon M., Solomon M. M., Van Wassenhove L. N., Duman Y., and Duazere-Peres, S. (1997), Solving the discrete lot-sizing and scheduling problem with sequence-dependent setup costs and set-up times using the Travelling Salesman Problem with time windows, European Journal of Operational Research, 100(3), 494-513 https://doi.org/10.1016/S0377-2217(96)00020-3
- Sungmin Kang, Kavindra Malik, L. Joseph Thomas (1999), Lotsizing and scheduling on parallel machines with sequence-dependent setup costs, Management science, 45(2), 273-289 https://doi.org/10.1287/mnsc.45.2.273
- Trigeiro W. W., Thomas, L. J., and McClain, J. O. (1989), Capacitated lot sizing with setup times, Management Science, 35(3), 353-366 https://doi.org/10.1287/mnsc.35.3.353
- William J. Cook, William H. Cunningham, William R. Pulleyblank, Alexander Schrijver, Combinatorial Optimization