DOI QR코드

DOI QR Code

Measurement of Prefounded Column Erection During Top Down Construction

Top Down 공사의 선기둥 수직도 계측

  • 임홍철 (연세대학교 건축공학과) ;
  • 신천균 (연세대학교 건축공학과 첨단구조연구실) ;
  • 김승원 (뉴테크구조기술사무소)
  • Published : 2006.12.20

Abstract

The purpose of this study is to measure the straightness of prefounded columns during underground construction stages. There are several causes of an error of prefounded column: (1) columns connected by welding or bolting, (2) by placement of concrete and aggregates around columns, (3) movement during construction, and (4) load applied during construction. The error of column straightness is different for each column, and the tilting of columns is shown in one or two directions between floors. The additional loads caused by the error of straightness may give damage to buildings. This paper presents the measurement results of column straightness, and thus providing a basis for further analysis.

Keywords

References

  1. 이웅균, 조호규, 김광희, 강경인, "건축공사 흙막이 계측관리를 위 한 유비쿼터스 시스템 구축 방안에 관한 연구", 한국건축시공학회 학술기술논문발표회 발표집, Vol. 4, No. 2 (2004), pp. 67-70
  2. 김민석, 서장우, 박우열, 서덕석, 강경인, "지하토공사에 있어서의 건축공사 계측관리의 개선방안에 관한 연구", 대한건축학회 학술지, Vol. 17, No. 10 (2001), pp. 129-135
  3. 임형일, 박희곤, 백민수, 조상영, 이영도, 정상진, "TOP-DOWN 공법에 의한 지하기둥의 시공성 향상을 위한 기초적 연구", 대한건축학회 학술발표대회 논문집, Vol. 21, No. 2 (2001), pp. 551-554
  4. 신천균, 임홍철, 김승원, "Top Down 선기둥의 계측과 자료 분석" 한국건축시공학회 학술기술논문발표회 논문집, Vol. 6, No. 1 (2006), pp. 173-176
  5. 강석규, 김응철, "PHC 말뚝 시공오차 보강방안", 건설기술정보 제32호 (2002. 7), pp. 12-22