References
- Ahamad, S., Schroeder, R.G., Sinha, K.K., 'The Role of Infrastructure Practices in the Effectiveness of JIT Practices : Implication of Plant Competitiveness,' Journal of Engineering and Technology Management, Vol.20, pp.161-191, 2003 https://doi.org/10.1016/S0923-4748(03)00017-1
- Albino,V. G. Carella, and O. Okogbaa, 'Maintenance Policies in Just-In- Time Manufacturing Lines,' International Journal of Production Research, Vol. 30, No. 2, pp.369-382, 1992 https://doi.org/10.1080/00207549208942900
- Ansari, A., 'Strategies for the Implementation of JIT Purchasing,' Just-In-Time Technique,' International Journal of Physical Distribution and Materials Management, Vol. 16, No. 7, pp.5-12, 1988
- Bartezzaghi, E., F. Turco, and G. Spina, 'The Impact of The Just-In- Time Approach on Production System Performance: A Survey of Italian Industry,' International Journal of Operations and Production Management, Vol. 12 No. 1, pp.5-17, 1992
- FeigenBaum, A.; Total Quality Control, NY, McGraw Hill, 1961
- Fullerton, R.R., McWatters, C.C., 'The Production Performance Benefits from JIT Implementation,' Journal of Operations Management, Vol. 19, pp.81-96, 2001 https://doi.org/10.1016/S0272-6963(00)00051-6
- Fullerton, R.R., McWatters, C.C., Fawson, C., 'An Examination of the Relationship between JIT and Financial Performance,' Journal of Operations Management, Vol. 21, pp.383-404, 2003 https://doi.org/10.1016/S0272-6963(03)00002-0
- Golhar, D., C. Stamm and W. Smith, 'JIT Implementation in Small Manufacturing Firms,' Production And Inventory Management Journal, Vol. 31, No. 2, pp.44-48, 1990
- Helms, M., 'The Key to JIT Success,' Production and Inventory Management Journal, Vol. 31, No. 2, p.18-21, 1990
- Hohner, G., 'JIT/TQC : Integrating Product Design with Shop Floor Effectiveness,' Industrial Engineering, Sept, pp.42-48, 1988
- Lee, S. and M. Ebrahimpour, 'Just-In- Time Production System : Some requirement for Implementation,' International Journal of Operations and Production Management, Vol. 4, No. 4, pp.3-15, 1984
- Lee, S. and S. H. Chung, 'Just-In-Time Implementation In a Job Shop : Critical Implementation Factors,' International Journal of Management, Vol. 8, No. 4, pp.734-745, 1991
- Monden, Y.; Toyota Production System, Industrial Engineering and Management Press, 1983
- Narasimhan, R., Das, A., 'The Impact of Purchasing Integration and Practices on Manufacturing Performance,' Journal of Operations Management, Vol. 19, pp.593-609, 2001 https://doi.org/10.1016/S0272-6963(01)00055-9
- Ohno, T., 'How the Toyota Production System was created, Japanese Economics Study,' Vol. 10, No. 4, pp. 83-101, 1982
- Schonberger, RJ.; World Class Manufacturing, NY, The Free Press, 1986
- Schonberger, RJ., and Gilbert, JP. 'Just-In-Time Purchasing: A Challenging for US Industry,' California Management Review, Vol. 26, No. 1, pp.54-68, 1983
- White, R., 'An Empirical Assessment of JIT in US Manufacturers,' Production and Inventory Management Journal, Vol. 34, No. 2, pp.38-42, 1993