Economical aessesment of long tunnel route complex geological formations

복잡한 지질구조암반층에서의 장대터널노선 선정을 위한 경제성 평가에 대한 연구

  • Published : 2005.09.01

Abstract

A new railway line of about 17km length was planned between Dongbaeksan and the neighboring town Dokye to improve the existing decrepit railway system. New line about 17km of the distance will almost be in circular alignment tunnels owing to the difference of elevation about 380m. Since the geology of the area is rather unusual compared to the normal in South Korea, extensive geological investigations have been carried out to prepare geological maps and profiles along the planned tunnel routes. The tunnel will almost be in sedimentary rock formations, such as limestone, sandstone, shale, coal etc and be near abandoned mines Various rock formations have the complicated, alter ed those rocks, but are well developed with laminated formations. Each rock formations have been classified using the Q-system and the cost of tunnel excavation, support has been estimated and compared for three alternative routes in the design stage. Based on these estimates, the final route of t he railway line was chosen.

강원도 동백산과 도계구간의 기존 노후 된 철도를 개량하기 위하여 새로운 장대터널을 계획하였다. 신설되는 터널은 두 지역의 표고차가 380m로 고저차가 심해 철도운영시설기준을 만족시키기 위하여 17km연장의 장대원형터널노선으로 계획하였다. 본 지역은 국내의 일반적인 지역에 비해 지질구조가 매우 복잡하기 때문에 계획한 터널노선의 지질 및 지층 상태를 규명하기 위하여 보다 정밀하고 광범위한 지질 및 지반조사를 실시하였다. 또한 계획된 터널은 석회함, 사함, 혈암 및 석탄층 퉁의 퇴적암층을 통과하며 근접하여 폐갱들이 존재하였다. 이들 암반층은 매우 다양한 형태의 서로 다른 암 종류로 혼재 되어 있어서 각 노선별 통과 암반층에 대하여 Q값에 의한 지반분류를 설시하고 터널의 굴착 지보 등에 대한 시공성 및 경제성등을 3개의 제안노선들에 대하여 제안한 평가 기법에 따라 평가를 설시하였다. 결과적으로 노선별 경제성 분석 결과에 따라 최적의 노선을 최종 선정하여 현재 시공 중에 있다.

Keywords

Acknowledgement

Supported by : 한국건설교통기술평가원