A Study on Optimal Reliability Criterion Determination for Transmission System Expansion Planning

  • Published : 2005.03.01

Abstract

The optimal design of transmission system expansion planning is an important part of the overall planning task of electric power system under competitive electricity market environments. One of main keys of the successful grid expansion planning comes from optimal reliability level/criteria decision, which should be given for constraint in the optimal expansion problem. However, it's very difficult to decide logically the optimal reliability criteria of a transmission system as well as generation system expansion planning in a society. This paper approaches a methodology for deciding the optimal reliability criteria for an optimal transmission system expansion planning. A deterministic reliability criteria, BRR (Bus Reserve Rate) is used in this study. The optimal reliability criteria, BRR/sup */, is decided at minimum cost point of total cost curve which is the sum of the utility cost associated with construction cost and the customer outage cost associated with supply interruptions for load considering bus reserve rate at load buses in long term forecasting. The characteristics and effectiveness of this methodology are illustrated by the case study using IEEE-RTS.

Keywords

References

  1. W.S Read, W.K. Newman, I.J. Perez-Arriaga, H.Rudnick, M.R. Gent & A.J. Roman, 'Reliability in the New Market Structure(Part1)', IEEE Power Engineering Review, p.4-14 , December. 1999
  2. W.S Read, W.K. Newman, I.J. Perez-Arriaga, H.Rudnick, M.R. Gent & A.J. Roman, 'Reliability in the New Market Structure(Part2)', IEEE Power Engineering Review, p.10-16, January. 1999
  3. M. Ilic, et al, Power Systems Restructuring; Engineering and Economics: Kluwer Academic Pub., 1998
  4. S. Niioka, R. Yokoyama K. Okada & H. Asano, 'Impact Evaluation of Reliability Management and Operation under the Deregulated Electric Power Market', proc. of conference, Singapore, IEEE PES WM2000 January. 2000
  5. Jaeseok Choi, Daeho Do, Seungpil Moon and Roy Billinton, 'Development of a Method for ELDC Construction in a Composite Power System', proc. of conference, Halifax, LESCOPE 1999, June. 1999
  6. X. Wang. and J.R. McDonald, Modern Power System Planning: McGraw-Hill, 1994
  7. Roy Billinton and Wenyuan Li, Reliability Assessment of Electric Power Systems Using Monte Carlo Methods: Plenum Press, 1994
  8. Roy Billinton and Ronald N. Allan, Reliability Evaluation of Power Systems, Second Edition, Plenum Press, 1996
  9. Roy Billinton and W. Zhang, 'Enhanced Adequacy Equivalent for Composite Power System Reliability Evaluation', proc. of conference, IEE, pp. 420-426, 1996
  10. Roy Billinton and A. Sankarakrishnan, 'A Comparison of Monte Carlo Simulation Techniques for Composite Power System Reliability Assessment', proc. of conference, IEEE WESCANEX '95, pp.145-150,1995 https://doi.org/10.1109/WESCAN.1995.493961
  11. Wang, J.R. McDonald, Modern Power System Planning (McGraw-Hill Book Company, 1994)
  12. Risheng Fang and David J. Hill, 'A New Strategy for Transmission Expansion in Competitive Electricity Markets', IEEE, Trans. on PS, vol.18, no.1, pp.374-380, Feb. 2003 https://doi.org/10.1109/TPWRS.2002.807083
  13. S.T.Y. Lee, K.L. Hocks, and E. Hnyilicza, 'Transmission Expansion of Branch and Bound Integer Programming with Optimal Cost Capacity Curves', IEEE, Trans. on PAS, vol. PAS-93, pp.1390-1400, Aug. 1970 https://doi.org/10.1109/TPAS.1974.293869
  14. R. Romero and A. Monticelli, 'A zero-one implicit enumeration method for optimizing investments in transmission expansion planning', IEEE Trans. Power Syst., vol. 9, pp. 1385-1391, Aug. 1994 https://doi.org/10.1109/59.336126
  15. E. L. Silva, H. A. Gil, and J. M. Areiza, 'Transmission network expansion planning under an improved genetic algorithm', IEEE Trans. Power Syst., vol. 15, pp. 11681175, Aug. 2000
  16. R. A. Gallego, R. Romero, and A. J. Monticelli, 'Tabu search algorithm for network synthesis', IEEE Trans. Power Syst., vol. 15, pp. 490495, May. 2000
  17. Roy Billinton, Reliability Assessment of Large Electric Power Systems (Kluwer Academic Publishers, 1986)
  18. Jaeseok Choi, Soonyoung Lee, 'A Study on Transmission System Expansion Planning using Fuzzy Branch and Bound Method', KIEE, Vol.2-A, No. 3, September. 2002
  19. Jaeseok Choi, Hongsik Kim, Junmin Cha and Roy Billinton; 'Nodal Probabilistic Congestion and Reliability Evaluation of a Transmission System under Deregulated Electricity Market', proc. of conference, Vancouver, Canada, IEEE, PES, SM2001, July 16-19, 2001 https://doi.org/10.1109/PESS.2001.970076
  20. S.P. Moon, J.B. Choo, D.H. Jeon, H.S. Kim, J.S. Choi and Roy Billinton; 'Transmission System Reliability Evaluation of KEPCO System in Face of Deregulation', proc. of conference, Chicago, USA, IEEE, PES, SM2002, July 21-25, 2002