DOI QR코드

DOI QR Code

작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구

A Study on the Productivity of Form Work by using Work Analysis Method

  • 정희경 (원광대 건축공학과 산업대학원) ;
  • 윤여완 (원광대 건축공학과) ;
  • 양극영 (원광대 건축공학과)
  • 발행 : 2005.12.01

초록

Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

키워드

참고문헌

  1. 안용선, 작업분석에 의한 철근콘크리트조 거푸집공사의 관리방법에 관한 연구, 한양대 박사 논문, 1993.
  2. 양극영 외, 건설현장의 작업측정을 통한 근로자 안전대책에 관한 연구, 노동부, 1992.
  3. 이재섭 외, 건설경영개론, 태림문화사, 1996.
  4. (주)대우기술연구팀, 거푸집공사의 이해와 시공, 기문당, 1993.
  5. 박동원 외, 공정관리 과학화 연구, 대한주택공사, 1993.
  6. 日本建築學會, 作業能率測定指針, 日本建築學會, 1990.

피인용 문헌

  1. Performance Criteria to Assess the Remodeling Feasibility of Office Buildings vol.12, pp.2, 2012, https://doi.org/10.5345/JKIBC.2012.12.2.142