Abstract

According to NERC definition, Available Transfer Capability (ATC) is a measure of the transfer capability remaining in the physical transmission network for the future commercial activity. To calculate Available Transfer Capability, accurate and defensible Total Transfer Capability, Capacity Benefit Margin and Transmission Reliability Margin should be calculated in advance. This paper proposes a method to quantify time varying Available Transfer Capability based on probabilistic approach. The uncertainties of power system and market are considered as complex random variables. Total Transfer Capability is determined by optimization technique such as SQP(Sequential Quadratic Programming). Transmission Reliability Margin with the desired probabilistic margin is calculated based on Probabilistic Load Flow analysis, and Capacity Benefit Margin is evaluated using LOLE of the system. Suggested Available Transfer Capability quantification method is verified using IEEE RTS with 72 bus. The proposed method shows efficiency and flexibility for the quantification of Available Transfer Capability.

Keywords

References

  1. Steven Stoft, Power System Economics, Designing Markets for Electricity, John Wiley and Sons, 2002
  2. North American Electric Reliability Council, Transmission Transfer Capability, A Reference Document for Calculating and Reporting the Electric Power Transmission Capacity of Interconnected Electric System, May 1995
  3. Marija Ilic, Francisco Galianan and Lester Fink, Power Systems Restructuring - Engineering and Economics, Kluwer Academic Publishers, 1998
  4. Transmission Transfer Capability Task Force, Available Transfer Capability Definitions and Determination, North American Electric Reliability Council, Princeton, NJ, June, 1996
  5. Yan Ou, Chanan Singh, 'Assessment of Available Transfer Capability and Margins', IEEE Trans. on PS, Vol. 17, No. 2, pp. 463-468, 2002 https://doi.org/10.1109/TPWRS.2002.1007919
  6. Yan Ou, Chanan Singh, 'Calculation of risk and statistical indices associated with available transfer capability', lEE Proc. Gener. Transm. Distrib. Vol. 150, No. 2. pp. 239-244, 2003 https://doi.org/10.1049/ip-gtd:20030024
  7. 김규호, 신동준, 김진오, 김태균, '가용송전용량 계산을 위한 최적화기법 응용', 대한전기학회 하계학술대회 A권, pp.183-185, 2004
  8. J. O. Kim and C. Singh, 'A Frequency and Duration Approach for Generation Reliability Evaluation Using the Method of Stages', IEEE Trans. on PS, Vol. 8, No. 1, pp. 207-215, 1993 https://doi.org/10.1109/59.221238
  9. Reliability Test System Task Force, 'The IEEE Reliability Test System - 1996', IEEE Trans. on PS, Vol. 14, No. 3