Classify and Quantify Cumulative Impact of Change Orders On Productivity Using ANN Models

  • 이민재 (충남대학교 공과대학 토목공학과)
  • Published : 2005.10.31

Abstract

Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.

Keywords

References

  1. Civitello, Andrew M. (1987). Contractor's Guide to Change Orders, Prentice-Hall, Inc., Englewood Cliffs
  2. Construction Industry Institute. (1990).' The Impact of Changes on Construction Cost and Schedule,'Publication 6-10, April, University of Texas at Austin, Austin, Texas
  3. Cushman, Robert, and Stephen Butler. (1994). Construction Change Order Claims, John Wiley and Sons, Inc., Somerset, NJ
  4. Hanna, Awad S. (2001). 'Quantifying The Cumulative Impact of Change Orders for Electrical and Mechanical Contractors.' Research Report 158-11, February, Construction Industry Institute (CII), University of Texas at Austin, Austin, TX
  5. Hanna, Awad S., Jefferey S. Russell, Erik V. Nordheim, and Mathew J. Bruggink. (1999a). 'Impact of Change Orders on.' Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 4, Jul./Aug., pp. 224-232 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:4(224)
  6. Hanna, Awad S., Jefferey S. Russell, Timothy W. Gotzion, and Erik V. Nordheim. (1999b) 'Impact of Change Orders on Labor Efficiency for Mechanical Construction,' Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, May/Jun., pp. 176-184 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(176)
  7. Hanna, A. S., Lotfallah, W. B., and Lee, M. J. (2002)'. Statistical- Fuzzy Approach to Quantify Cumulative Impact of Change Orders,' Journal of Computing in Civil Engineering, American Society of Civil Engineers (ASCE), Vol. 16, No.4, October 2002, pp. 252-258
  8. Hanna, A. S., Camlic R., Peterson, P. A., and Lee, M. J.(2004). 'Cumulative Effect of Project Changes for Electrical and Mechanical Construction,' Journal of Construction Engineering and Management, ASCE, Vol. 139, No. 6, Nov./Dec, pp. 762-771
  9. Haykin, S. (1994). Neural Networks: A Comprehensive Foundation, MacMillan College Publishing Co., New York
  10. Ibbs, C.W. and Walter E. Allen. (1995)'. Quantitative Impacts of Project Change.'Source Document108, May, Construction Industry Institute, University of Texas at Austin, Austin, TX
  11. Lee, M. J.(2002). 'Artificial Intelligence Approach to Classify and Quantify Cumulative Impact of Change Orders on Labor Productivity,'Ph.D. Dissertation, University of Wisconsin- Madison, Madison, WI
  12. Lee, M. J., Hanna, A. S., and Loh, W. Y. (2004). 'Decision Tree Approach to Classify and Quantify Cumulative Impact of Change Orders On Productivity,' Journal of Computing in Civil Engineering, ASCE, Vol. 18, No. 2, April, pp. 132-144 https://doi.org/10.1061/(ASCE)0887-3801(2004)18:2(132)
  13. Leonard, Charles A. (1988). 'The Effects of Change Orders on Productivity.'Masters Thesis, Concordia University, Montreal, Quebec, Canada
  14. Moselhi, O. (1998). 'Estimating the Cost of Change Orders' 1998 AACE International Transactions, Morgantown, WV:AACE International
  15. Schwartzkopf, William. (1995). Calculating Lost Labor Productivity in Construction Claims, John Wiley & Sons, Inc., Somerset, NJ
  16. Werbos, P. (1974). 'Beyond Regression: New Tools for Prediction and Analysis in the Behavioral Sciences,'PhD thesis, Department of Applied Mathematics, Harvard University, Cambridge, Massachusetts