DOI QR코드

DOI QR Code

Parallel reservoirs system operation using NYC-Space Allocation-Rule

NYC-Space Allocation Rule을 이용한 병렬저수지 연계운영

  • Park Ki-Bum (Department of Construction Information, Andong Science College) ;
  • Lee Soon-Tak (School of Civil. Urban and Environment Engineering, Yeungnam University)
  • 박기범 (안동과학대학 건설정보과) ;
  • 이순탁 (영남대학교 토목도시환경공학부)
  • Published : 2005.06.01

Abstract

In this study, an optimization technique was developed from the application of Allocation Rule. Average Allocation coefficients of the Andong and Imha dam compare constant water supply condition with vary water supply condition that are above the contribute ratio $67\%\~50\%$ the Andong dam in Rule(A)-Rule(C). In the Refill Season, Andong dam water supply contribution is higher than Imha dam at the Control point water supply. In the Allocation analysis results, Rule(A) is calculated storage ratio because Andong dam contribute to Control point larger than Imha dam which Andong dam storage is larger than Imha dam storage. Rule(B) calculated sum of the storage and inflow ratio for Andong dam and Imha dam, as Andong dam contribution is higher than Imha dam. Rule(C) calculated that sum of storage, inflow and water supply is divided average storage ratio, as the best results of the Allocation coefficients and water supply capacity. The results of storage analysis is larger vary water supply condition than constant water supply condition and the results of water supply analysis is larger vary water supply condition than constant water supply condition. Water supply deficit is decrease $30\%$ for vary water supply condition.

Keywords

References

  1. Edward, J. C., 1950, New York control curves, J. Am. Water Works Assoc, 42(9), 823-857
  2. Sand, G. M., 1984, An analytical investigation of water supply reservoir in parallel, Ph. D. thesis, Cornell Univ., Ithaca, N. Y
  3. Johnson, S. A. and K. Staschus, 1991, Heuristic Operating Policies for Reservoir System Simulation, W.R.R., 27(5), 673-685 https://doi.org/10.1029/91WR00320
  4. Lund, J. R. and J. Guzman, 1999, Derived Operating Rules for Reservoirs in Series or in Parallel, Journal of Water Resources Planning and Management, 125(3), 143-153 https://doi.org/10.1061/(ASCE)0733-9496(1999)125:3(143)
  5. 박기범, 이순탁, 2004, 가뭄기간의 저수지 운영 방안에 관한 연구, 한국환경과학회지, 13(12), 1041-1048
  6. Mingyen, Tu., 2002, Optimal of Reservoir Operation and Rule Curves by Mixed-Interger Programming., Ph. D. thesis California Univ. Los Angels, 2-25
  7. 수자원 관리종합 정보시스템, http://wamis.or.kr/
  8. Revelle, C., 1999, Optimizing Reservoir Resources Including. A New Model for Reservoir Reliability., John Willy & Sons Inc., 22-44
  9. Hashimoto, T., J. R. Stedinger and D. P. Loucks, 1982, Reliability, Resiliency, and Vulnerability Criteria For Water Resources System Performance Evaluation, W.R.R., 18(1), 14-20 https://doi.org/10.1029/WR018i001p00014
  10. Stedinger, J. R., 1984, The performance of LDR models for preliminary design and reservoir operation, W.R.R., 20(2), 215-224 https://doi.org/10.1029/WR020i002p00215
  11. 건설교통부, 1998, 한국수자원공사 기존댐 용수공급능력평가 보고서(낙동강수계), 1998. 12