Abstract
Together with the requirements of tunnels, its construction methods and technologies have been pretty much developed, but frequent accidents happened under the constructions are just one of important problems which should be improved. To detect the potential hazardous factors in or ahead of time, speedy and accurate observation are absolutely required, but currently surveying method using tapes, level and total station, has been generally taken in measuring of tunnel convergence and crown. The purpose of this study is, as using of industrial photogrammetry system which is supplying more accuracy and speedy in the measure of tunnel convergence and crown. From the result of this study, we have got up to 1/20,000 accuracy and totally 6 minutes, from picturing 5 sections by one person to data edition, has been taken except setting targets.
터널공사의 시공방법은 시대에 따라 많은 발전을 해왔으나 아직도 시시각각으로 일어나는 터널 공사중의 사고는 반드시 극복해야할 과제다. 이러한 위험요소를 빨리 발견하고 대비하기 위해서는 관측의 정확성과 신속성이 요구되고 있으나 아직도 천단침하 및 내공변위 관측에 줄자, 레벨 또는 토털스테이션 등을 이용하는 일반적인 측량 방법에 의존하고 있는 실정이다. 따라서, 본 연구에서는 산업사진측량기법을 이용하여 터널의 내공변위 및 천단침하를 정밀하고 신속하게 관측할 수 있는 기법을 제시하는데 목적이 있다. 연구결과 1/20,000 이상의 정밀도로 측정 할 수 있었으며, 타겟 설치를 제외하면 1인의 작업자가 5개 단면을 사진촬영하고 자료를 처리를 하는데 소요된 시간은 약 6분이 소요되었다.