An Algorithm for the Efficient Operation of the U-Shaped Line

생산율에 따른 U-라인의 효율적인 운용 알고리즘

  • Published : 2004.03.01

Abstract

The production using U-shaped line is studied. This research presents the relationship among machining time, cycle time and production rate in a U-shaped line. The U-shaped line produces shafts by automated machines. In this paper when any production rate is given the U-shaped line always satisfies the production rate. An algorithm is developed for the determination of cycle time, the number of machines and workers of the U-shaped line in order to minimize the total machine capacity and the number of workers for any given production rate. The U-shaped line was successfully designed by applying the proposed algorithm.

Keywords

References

  1. Black, J. T., The Design of the Factory with a future, McGraw-Hill, Inc., 1991
  2. Degarmo, E. Paul, J. T. Black and Ronald A. Kohser, Materials and Processes in Manufacturing, 8th ed., Prentice-Hall, Inc., 1997
  3. Edward J. Anderson, The Management of Manufacturing Models and Analysis, Addison Wesley, Great Britain, 1994
  4. Miltenburg, J. and J. Wijngaard, 'The V-Line Balancing Problem,' Management Science, Vol.40, No.10 (1994), pp.1378-1388 https://doi.org/10.1287/mnsc.40.10.1378
  5. Moden, Y., Toyota Production System, (2nd Ed.), Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, GA, 1993
  6. Redford, A. and Chal, J., Design for Assembly, McGraw-Hill, Inc., 1994
  7. Scholl, A. and R. Klein :ULINO:, 'Optimally Balancing V-Shaped JIT Assembly Lines,' International Journal of Production Research, Vol.37, No.4(1999), pp.721-736 https://doi.org/10.1080/002075499191481
  8. Shingo, Shigeo, A Study of the Toyota Production Systems, Productivity Press, 1989
  9. Sparling, D. and J. Miltenburg, 'The mixed-model V-line balancing problem,' International Journal of Production Research, Vol.36, No.2(1998), pp.485-501 https://doi.org/10.1080/002075498193859
  10. Ueno T., Yuichi T., 'A study on Assembling Line System Based on the Relationship between Work Element and Cycle Time,' Journal of Japan Industrial Management Association, Vol.45, No.4(1974), pp.337-344
  11. Urban , J. T., 'Optimal Balancing of U-Shaped Assembly Lines,' Management Science, Vol.44, No.5(1998), pp.738-741 https://doi.org/10.1287/mnsc.44.5.738