Abstract
In order to scheme the optimal assumption that satisfies the travel demand, it should be review the elements that affect on determining the headway, which are signal systems, line shape, vehicle(Light Rail Transit) performance, and so on. When applying the conventional signal systems, including Fixed Block System and Moving Block System, It was confirmed whether or not satisfy the requirements of target line with the way of a numerical formula reviewing and Train performance Simulation on the main line, station, depot, and so forth. Therefore, it should be used as references that decide target line and each sub-system after identifying the compliances for Minimum Headway to Moving Block System.