This paper presents the methodology to analyze flow duration characteristics and performance prediction technique for small hydro power(SHP) Plants and its application. The flow duration curve can be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction technique has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique, Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated, It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

Keywords

References

  1. 차종희 외, 소수력발전의 설계에 관한 연구, 대한전기협회, 조사연구논문, 1982
  2. 이철형 외, 소수력발전소 건설 타당성조사 기본계획 연구, 한국에너지기술연구소, 연구보고서, 1997
  3. 石崎彰, 古市正敏, 小水力發電 讀本, オ-ム社, 1981
  4. 박완순, 이철형, 심명필, "국내 소수력발전입지의 개발타당성 분석", 대한토목학회논문집, Vol. 17, No. II-3, 1997, pp. 197-205
  5. 김 숭, "우리나라 수자원 정책의 문제점과 대안", 물위기 시대 우리나라 수자원 정책, 환경정책 시민연대, 2000, pp 187-201
  6. Park, Wan-Soon, Lee, Chul-Hyung, and Jeong, Sang-Man(2001), "An Analysis of Performance Characteristics for Small Hydro Power Plants", KWRA, Vol. 2, No. 1, 2001, pp. 11-19
  7. Robert Noyes, Small and Micro Hydro-Electric Power Plants "Technology and Feasibility", Energy Technology Review, No.60, Noyes Data Corperation, U.S.A., 1980, pp. 165-171